My WebLink
|
Help
|
About
|
Sign Out
PRUDENTIAL INSURANCE 1984
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
P
>
PRUDENTIAL INSURANCE 1984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2007 3:05:10 PM
Creation date
10/29/2007 2:11:24 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
4/10/1984
LONG TERM AGREEMENTS - NAME
PRUDENTIAL INSURANCE
LONG TERM AGREEMENTS - TYPE
REIMBURSEMENT AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAMP DRESSER 8 McKEE INC. <br />Mr. Robert T. Okamura <br />December 3, 1985 <br />Page 7 <br />Estimated Level of Effort <br />Task 1: Evaluate Existing Turnouts <br />Task 2: Inventory Water Services <br />$ 8,000 <br />25,000 <br />'~ New Turnout: <br />Design <br />Services During Construction <br />20,000 <br />5,000 <br />Pipe and Valve Modifications at Existing <br />Turnout Nos. 1, 2, 3, and 4: <br />Design 5,000* <br />Services During Construction 4,000 <br />_ Relocated Foothill Booster Pump Station No. 1: <br />Analysis and Pipeline Design 5,000 <br />Final Design 28,000 <br />Services During Construction 10,000 <br />50 Individual Booster Pump Systems or <br />Water Service Improvements: <br />Design 30,000* <br />Services During Construction 16,000* <br />Subtotal, Evaluation & Inventory: $ 33,000 <br />Subtotal, Design 88,000 <br />Subtotal, Services During Construction 35,000 <br />TOTAL $156,000 <br />*These amounts will be re-estimated at the completion of Tasks 1 and 2. <br />Services described herein for the individual booster pump systems will be <br />for all CDM services on these systems and no compensation has or will be <br />requested under the current agreement dated April 10, 1984. <br />TIME OF PERFORMANCE <br />We can begin work within two days of receipt of authorization to proceed. <br />Tasks 1 and 2 can be performed in one month and, following the Task 3 meet- <br />ing, the design of all improvements can be accomplished in four months, <br />perhaps sooner. The services during construction will be in conformance <br />with the construction schedules of the Contractor. <br />
The URL can be used to link to this page
Your browser does not support the video tag.