My WebLink
|
Help
|
About
|
Sign Out
SAFEWAY COST REIMBURSEMENT 2001
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
S
>
SAFEWAY COST REIMBURSEMENT 2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2007 4:12:09 PM
Creation date
11/1/2007 12:25:37 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
2/13/2001
LONG TERM AGREEMENTS - NAME
SAFEWAY
LONG TERM AGREEMENTS - TYPE
REIMBURSEMENT AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ ~ <br />Table 1 <br />CONTRIBUTING PROJECTS -ULTIMATE SHARES <br />Contributing Projects P.M. Peak <br />Hour Trips Percentage <br />share Estimated <br />share of <br />signal costs <br />STONERIDGE <br />Sears (178,000 sf) 490 15.8% $18,960 <br />Other expansions (380,000 sf) 1,047 33.8% $40,560 <br />HIKES (Wells Fazgo) <br />Buildings 1 and 2 (302,374 sfj 401 12.9% <br />Buildings 3 and 4 (302,376 sfj 402 13.0% $31,080 for <br />both <br />KAISER <br />Medical Office Building #3 (66,000 sf) 204 6.6% $7,920 <br />Medical Office Building #4 (100,000 sf) 366 11.8% $14,160 <br />SAFEWAY <br />Expansion (209,000 sf), less trips from <br />uses removed 187 (net) 6.0% $7,200 <br />TOTALS 3,097 99.9% $120,000 <br />approx. <br />
The URL can be used to link to this page
Your browser does not support the video tag.