My WebLink
|
Help
|
About
|
Sign Out
SIGNATURE PROPERTIES RUBY HILL PUMP STATION (2)
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
S
>
SIGNATURE PROPERTIES RUBY HILL PUMP STATION (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2007 4:40:48 PM
Creation date
11/1/2007 3:21:31 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
4/15/1994
LONG TERM AGREEMENTS - NAME
SIGNATURE PROPERTIES
LONG TERM AGREEMENTS - TYPE
REIMBURSEMENT AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />REIMBURSEMENT AGREEMENT FOR <br />INSPECTION SERVICES OF RUBY HILL PUMP STATION <br />THIS AGREEMENf'~ _i~~ tered into at Pleasanton, California, this <br />1.~ day of /t{/ , 1994 by and between the CITY OF <br />PLEASANTON, Alameda County, California, a municipal corporation <br />("City") and Signature .Properties ("Developer") with reference to <br />the following facts. <br />A. Developer is the owner of certain real property in the <br />City of Pleasanton, County of Alameda, State of California,. <br />commonly known as Ruby Hill. (the "Property"). Developer has <br />obtained City approval of a tentative map for an 850 unit single- <br />family residential project to be constructed on the Property. <br />B. In connection with construction described above, <br />Developer is required. to construct a water pump .station and <br />reservoir. <br />C. City desires to contract directly with Arthur Engineering <br />Inc. for inspection services, shop drawing review, and related <br />documents for Ruby Hill water pump station, reservoir and <br />telemetry. <br />NOW, THEREFORE IT IS AGREED AS FOLLOWS: <br />1. Work Developer is constructing the Ruby Hill Pump <br />Station, reservoir and telemetry as per plans and specifications <br />approved by the City Engineer. As part of the construction, City <br />desires to contract directly with its consultants to complete shop <br />drawing review, assist in change orders, and periodic inspection. <br />2. Reimbursement Developers agree to reimburse City for <br />all costs for all work described in Paragraph 1 above. No overhead <br />shall be charged by the City. Developer shall make payment to the <br />..City within thirty (30) days after the receipt of invoices from <br />City. <br />3. Amount Developers shall pay the City a total amount <br />not to exceed $7,000.00 for the work described in Paragraph 1. <br />4. Term This agreement shall remain in effect until such <br />time as the Ruby Hill. pump station, reservoir and telemetry is <br />completed and accepted by the City. <br />5. Compliance with Laws. The Developer shall comply with <br />all applicable federal, state, and municipal laws, rules, and <br />ordinances. No discrimination shall be made by the Developer in <br />the. employment of persons to work under this contract because of <br />race, color, national origin, ancestry, sex or religion of such <br />person. <br />
The URL can be used to link to this page
Your browser does not support the video tag.