Laserfiche WebLink
~ .. .. i • <br />A. 4" Service Stub <br />8. 1 1 /2" Service <br />C. 1 " Irrigation Service <br />4" Fire Service <br />Subtotal Water <br />7. Utilities <br />Subtotal Utilities <br />SUBTOTAL IMPROVEMENT COST <br />8. Improvement Plan Check 12% of S24,034) <br />9. Construction Inspection 14% of S24,034) <br />10. Bonds 12% of S24,034) <br />1 1 . Civil Engineering & Staking (10% of S24,03 <br />1 2. Soils Engineer 16% of 524,034) <br />II. BUILDING CONSTRUCTION <br />111. LAND COST <br />IV. CITY BUILDING UPGRADE COSTS <br />TOTAL COST <br />i~J <br />22 LF 520.00 5440 <br />1 EA 5450.00 $450 <br />1 EA 5400.00 5400 <br />1 EA 5750.00 S750 <br /> S 2.040 <br />1 LS S3,500.00 53,500 <br /> 53,500 <br /> 568,466 <br />1 LS Fee waived <br />1 LS Fee waived <br />1 LS Fee waived <br />1 LS 56,847 <br />1 LS S4,108 <br />1 LS S147,000.00 5147,000 <br />1 LS S30,000.00 330.000 <br />1 LS 14388 514,388 <br />5270,808 <br />^~» »• PAGE 2 of 2 EXHIBIT A <br />