Laserfiche WebLink
Mrs. Dorothy Arata and Mr. Elvin Andrarlp <br /> 4223 thru 4277 First Street, Pleasant Plaza <br /> QUANTITY MATERIAL LABOR TOTAL <br /> No. UNIT RATE TOTAL RATE TOTAL COST <br /> Demo Conduit <br />" 1 lot $0.00 $108.00 $108.00 $108 <br />00 <br /> 5 <br />Electrical . <br /> Metalic Tubing 160 If $36.30 $5,808.00 $40.10 $6,416.00 $12,224.00 <br /> 5" Coupling 22 ea $85.60 $1,883.20 $52.20 $1,148.40 $3,031.60 <br /> <br />P 5" Termination 4 ea $93.80 $375.20 $52.20 $208.80 $584.00 <br />G 5" Elbow 8 ea $409.50 $3,276.00 $144.00 $1,152.00 $4,428.00 <br />& <br />E 5" Support <br />800 Amperes 22 ea $13.70 $301.40 <br />$5.80 <br />$127.60 <br />$429.00 <br /> Termination Can <br /> Enclosure 1 ea $505.00 $505.00 $384.00 $384.00 <br />$889 <br />00 <br /> Subtotal Direct Cost $12,148.80 $9,544.80 . <br />$21,693.60 <br /> + 20% contingency $2,429.76 <br />$1,908.96 <br />$4,338.72 <br /> PG&E Subtotal $14,578.56 $11,453.76 $26,032.32 <br /> 3" Rigid <br />C Galvanized Steel 10 If $17.10 $171.00 $12.80 $128.00 $299 <br />00 <br />B M 3" Coupling 1 ea $16.90 $16.90 $27.40 $27.40 . <br />$44.30 <br />C C 3" Elbow 1 ea $63.70 $63.70 $96.00 $96.00 $159 <br />70 <br />A <br />& S Subtotal Direct Cost <br />$251.60 <br />$251.40 . <br />$503.00 <br />T + 20% contingency $50.32 $50.28 <br />$100.60 <br /> SBC +Comcast Subtotal $301.92 $301.68 $603.60 <br />- PG&E will pay for all trench work. <br />- Rule 20 will contribute $1500 towards PG&E conversions. <br />Property owner pays remainder. <br />- Property owner pays all SBC and Comcast conversions. <br />PG&E property owner costs equal $26,032.32 - $1,500 = $24,532.32 <br />SBC and Comcast property owner costs = $603.60 <br />Total cost to property owner = $25,135.92 <br />This estimate is preliminary, and actual costs will depend on the competitive bidding process. <br />