My WebLink
|
Help
|
About
|
Sign Out
PACIFIC GAS AND ELECTRIC REIMBURSEMENT 1991
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
P
>
PACIFIC GAS AND ELECTRIC REIMBURSEMENT 1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2007 3:22:30 PM
Creation date
11/5/2007 2:19:11 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
10/15/1991
LONG TERM AGREEMENTS - NAME
PACIFIC GAS AND ELECTRIC
LONG TERM AGREEMENTS - TYPE
REIMBURSEMENT AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />"Improvements" include the installation of a 12-inch water line <br />extension 10 feet from the face of curb in Stanley Boulevard from <br />the 20-inch water main located at the intersection of Bernal Avenue <br />and Stanley Boulevard, to the eastern property line of Pacific Gas <br />and Electric Company's Vineyard Substation, located at 3350 Stanley <br />Boulevard. The total distance of the water line extension is 1164 <br />linear feet. The work includes three butterfly valves. <br />The total actual cost for the water line extension is $104,640.00. <br />1164 L.F. of 12" Water Main Cost Breakdown <br />Description Cost <br />1. Backfill material for trench <br />compaction (3/4 AB) ................................18,467.00 <br />2. Concrete treated Base 15" <br />in trench ...........................................8,858.00 <br />3. Furnish & install 12" DIP pipe .....................56,218.00 <br />4. Tie into 20" line w/20" valve ......................11,298.00 <br />5. 3" AC paving ....................... ................7,455.00 <br />6. Flagging traffic control/ <br />Mobilization ........................................2,344.00 <br />TOTAL ............................................$104,640.00 <br />Benefitted Properties * Prorata Share <br />1. Pacific Gas & Electric (PG&E) ......................20,137.00 <br />2. Oliver de Silva (ODS) ..............................20,137.00 <br />3. East Bay Regional <br />Park District (EBRPD) .............................20,137.00 <br />TOTAL ............................................$60,411.00 <br />12" WM along PG&E's property frontage (492 L.F.) - $44,229.00 <br />104,640.00 Total cost of 12" water main installation <br />- 64,366.00 PG&E's prorata share and frontage cost <br />$40,274.00 Total reimbursement fees to be collected <br />* Each benefitted property shall pay 1/3 the cost of the 12" water <br />main along Auf Der Maur/Rickenbach's property frontage (672 <br />L.F.), as shown on Exhibit B. <br />
The URL can be used to link to this page
Your browser does not support the video tag.