Laserfiche WebLink
1. Cooperative Efforts. School District shall cooperate <br />with City in providing a community recreation program under the <br />authority contained in Sections 10900-10916, inclusive, of the <br />Education Code of the State of California, in connection with the <br />use of the two Gymnasium Facilities referred to herein. <br />2. Construction of City Facilitv. School District shall <br />cause to be constructed at the Harvest Park Middle School, 4900 <br />Valley Avenue, Pleasanton, California (hereafter "the Harvest <br />Park site"), a City Gymnasium Facility, together with an adequate <br />parking area on the Harvest Park site. (The City Gymnasium <br />Facility, together with the parking area, will collectively be <br />referred to as "the City Facility.") The City Facility shall be <br />operated by the City and shall be used for community recreation <br />purposes. <br />3. Construction of School Facilitv. School District shall <br />also cause to be constructed at the Harvest Park site a School <br />Gymnasium Facility, (hereafter referred to as the School <br />Facility). The School Facility shall be constructed so as to be <br />immediately adjacent to, and to be used in conjunction with, the <br />City Facility. <br />4. Consultants. School District shall employ engineering <br />and architectural consultants to design the City Facility. <br />5. Meet and Confer. School District shall require its <br />consultants to meet and confer with City prior to commencing <br />design work on the City Facility and at regular intervals <br />throughout the design and construction stages. <br />3 <br />