My WebLink
|
Help
|
About
|
Sign Out
ORD 1962
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1901 - 2000
>
ORD 1962
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:23:47 PM
Creation date
11/7/2007 2:43:39 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
11/6/2007
DESTRUCT DATE
PERMANENT
DOCUMENT NO
ORD 1962
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
92. The owner/contractor shall submit two copies of the site soils report to the Chief <br />Building and Safety Official for third party peer review and shall pay for such <br />review at the time specified by the Building and Safety Official, but in all cases <br />before the issuance of a grading permit. <br />93. The owner of a residential lot who, whether on his/her own or through a contractor <br />(hereafter, "owner/contractor"), obtains a building permit shall show the proposed <br />green building checklist on one of the first two pages of the plans submitted for <br />the issuance of a building permit. The sheet number(s) where each checklist item <br />is addressed in the plan set shall be noted on the checklist. All proposed green <br />building measures shall be shown throughout the plan set, as appropriate, as <br />determined by the Planning Director and the Chief Building and Safety Official. A <br />special inspection by a representative from the Planning Department shall be <br />coordinated with regards to landscaping, irrigation, and exterior materials. All of <br />the green building measures indicated on the approved checklist shall be <br />inspected and approved by either the City of Pleasanton, a qualified specialist, or <br />the applicant shall provide written verification by the project engineer, architect, <br />landscape architect, or designer. This condition shall appear in the design <br />guidelines. <br />94. Prior to final building permit inspection and occupancy, a final inspection and <br />approval by the Planning Department is required in order to confirm that all <br />conditions of approval prior to occupancy have been satisfied. <br />95. Prior to the first framing inspection, the height of the primary structure shall be <br />surveyed and verified as being in conformance to the approved building heights <br />shown on the building permit plan sets. Said verification is the owner's/ <br />contractor's responsibility and shall: <br />• Be performed by a licensed land surveyor or civil engineer. <br />• Be completed and provided to the Planning Department. <br />• Reviewed and determined to be correct by the Planning Department. <br />Fire Department Requirements <br />96. The project developer and the owner/contractor shall meet all requirements of <br />the Pleasanton Fire Code (Pleasanton Municipal Code, Chapter 20.24) and this <br />PUD approval for the subdivision/lots. <br />97. The owner/contractor shall keep the construction site free of fire hazards from the <br />start of lumber construction until the final inspection. <br />98. The Fire Chief and the City Engineer shall approve the number, type, and <br />location of all public fire hydrants and the Fire Chief and the Chief Building and <br />Safety Official of all private fire hydrants. <br />Page 37 of 39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.