My WebLink
|
Help
|
About
|
Sign Out
PRUDENTIAL INSURANCE FOOTHILL RD. RESERVOIR SITE
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
P
>
PRUDENTIAL INSURANCE FOOTHILL RD. RESERVOIR SITE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2007 9:05:00 AM
Creation date
11/19/2007 8:31:02 AM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
10/11/1983
LONG TERM AGREEMENTS - NAME
PRUDENTIAL INSURANCE
LONG TERM AGREEMENTS - TYPE
PUBLIC IMPROVEMENT AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
funding in advance of the formation of the North Pleasanton <br />jlater Improvement District to accelerate the construction of <br />the Foothill Reservoir in order that development of its <br />proposed project can proceed expeditiously, subject to <br />Prudential obtaining necessary governmental approval. <br />D. The preliminary design of Foothill Reservoir was <br />completed by contract between the City and Camp, Dresser & <br />McKee, Inc. dated November 9, 1982. The City was reimbursed <br />by Prudential for the cost of the preliminary design pursuant <br />to an agreement dated December 6, 1982. <br />E. On July 12, 1983, the City authorized a contract <br />for Phases II and LII (final design and construction services <br />for the proposed Foothill Reservoir) with Camp, Dresser & <br />McKee, Inc. <br />F. On July 26, 1983, the City and Prudential entered <br />an agreement providing for reimbursement to City for final <br />design of Foothill Reservoir, site acquisition costs, assessment <br />district engineering costs and site construction services. <br />G. City has prepared an initial study of site preparation <br />and construction of Foothill Reservoir dated October 6, <br />1983. <br />NOW, THEREFORE, in consideration of the faithful performance <br />of the promises, terms, conditions and covenants set forth <br />herein, the parties hereto agree as follows: <br />1. Time of Essence. Time is of the essence in the <br />performance of this agreement. The work and improvements <br />required by this agreement to be completed by Developer <br />shall be completed within one (1) year from the above- <br />-?_- <br />
The URL can be used to link to this page
Your browser does not support the video tag.