My WebLink
|
Help
|
About
|
Sign Out
15 ATTACHMENT 9
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
031808
>
15 ATTACHMENT 9
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2008 1:56:39 PM
Creation date
3/14/2008 4:54:38 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/18/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
15 ATTACHMENT 9
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b) All cut and fill slopes shall be revegetated and stabilized after completion of <br />grading, but in no case later than October 15. Hydroseeding shall be <br />accomplished before September 15 and irrigated with a temporary irrigation <br />system to ensure that the grasses are established before October 15. No grading <br />shall occur between October 15 and April 15 unless approved erosion <br />control/storm water quality measures are in place, subject to the approval of City <br />Engineer/Chief Building Official. Such measures shall be maintained until such <br />time as permanent landscaping is place. <br />c) Gather all construction debris on a regular basis and place it in a dumpster or <br />other container which is emptied or removed on a weekly basis. When <br />appropriate, use tarps on the ground to collect fallen debris or splatters that <br />could contribute to storm water runoff pollution. <br />d) Remove all dirt, gravel, rubbish, refuse, and green waste from the street <br />pavement and storm drains adjoining the site. Limit construction access routes <br />onto the site and place gravel on them. Do not drive vehicles and equipment <br />off paved or graveled areas during wet weather. Broom sweep the street <br />pavement adjoining the project site on a daily basis. Scrape caked-on mud and <br />dirt from these areas before sweeping. <br />e) Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain <br />inlet nearest the downstream side of the project site in order to retain any <br />debris or dirt flowing in the storm drain system. Maintain and/or replace filter <br />materials to ensure effectiveness and to prevent street flooding. <br />f) Create a contained and covered area on the site for the storage of bags, cement, <br />paints, oils, fertilizers, pesticides, or other materials used on the site that have <br />the potential of being discharged into the storm drain system through being <br />windblown or in the event of a material spill. <br />g) Never clean machinery, equipment, tools, brushes, or rinse containers into a <br />street, gutter, or storm drain. <br />h) Ensure that concrete/gunite supply trucks or concrete/plaster operations do not <br />discharge wash water into street, gutters, or storm drains. <br />Stormwater Operation Requirements <br />108. Unless otherwise determined by the City Engineer or Chief Building Official, the <br />developer and/or future property owners shall enter into a recorded Stormwater <br />Treatment Measures Inspection and Maintenance Agreement for ongoing <br />
The URL can be used to link to this page
Your browser does not support the video tag.