Laserfiche WebLink
ATTACHMENT 1 <br /> ~~I Environmental • Geotec6nical • Special Inspections • Materials Testing <br /> • <br /> $EtlvvnvG NORT1)ERN CALIl70RNIA SINCE 1969 ~ ,, r <br />-~ <br />._~ <br /> Project No. 9929.G <br />SAN JOSE 22 June 2007 <br />322 Piercy Road <br />San Jose, CA 95138 jVjT, John McInnes <br />Phone: (408) 362-4920 <br />Fax: (408) 362-4926 JMA Architects <br /> 933 South Pacific Coast Highway <br /> Laguna Beach, CA 92651 <br />LrvExMOxE <br />257 Wright Brothers Ave. <br />Livermore, CA 94551 <br />Phone: (925) 243-6662 Subject: Proposed Residential Subdivision <br />Fax: (925).243-6663 Lot 27, 1630 Vineyard Avenue <br /> Pleasanton, California <br /> <br />SACRAMENTO Evaluation of Dry Wells <br />4200 N. Freeway Blvd. <br />Suite 2 <br />Sacramento, CA 95834 <br />Phone: (916) 564-7809 Dear Mr. McInnes: <br />Fax: (916)564-7672 <br /> At your request, we are presenting herein our evaluation of the use of dry wells for the <br />~"~"'''D estate lot at the subject property. <br />7700 Edgewater Drive <br />Suite 847 <br />Oakland, CA 94621 It is our understanding that it is proposed to construct several dry wells within the <br />Phone: (510) 633-1332 <br />Fax: (408) 362-4926 estate lot to discharge all roof and some surface drainage water, in lieu of collecting <br /> into a solid pipe system to a storm drain system. <br />FRESNO <br />4339 N.SC;o1dmOSlabeBlvd The materials encountered in the test pits excavated in the estate lot vicinity <br />Fresno, CA 93722 <br />Phone: (559) 271-0773 encountered inter-bedded gravels, sands, silts, and clays. The presence of gravels and <br />Fax: (559) 271-0763 sands would provide good percolation. <br />WEBSrrE In concept, the use of dry wells for roof and surface water discharge is acceptable. <br />www. terrasearchinc. com <br />However, additional subsurface investigation work is needed to evaluate the actual <br />E-ice, percolation rate at each proposed dry well location to design the dry well. Due to the <br />info@terrasearchinc.com relativity steep terrain this work will need to be done after the pad has been rough <br /> graded. <br />