Laserfiche WebLink
18.48.150 <br />2. The Zoning Administrator finds that <br />adequate parking is available for the said <br />use. <br />The standard City noise ordinance ap- <br />plies. <br />Trucking terminals. <br />Warehousing, not including the storage <br />of fuel or flammable liquids. <br />Welding shops. <br />Wholesale business establishments. <br />Wood and lumber processing and <br />woodworking, including planing mills, <br />sawmills, excelsior, plywood, veneer and <br />wood preserving treatment. <br />Woodworking shops; cabinet shops. <br />Wool scouring and pulling. <br />C. Any other use which is determined <br />by the city planning commission, as pro- <br />vided in Chapter 18.128 of this title, to be <br />similar to the uses listed in this section. <br />(Ord. 1950 § 2 (Exh. A), 2007; Ord. 1738 <br />§ 1, 1998; Prior Code § 2-7.20(2)) <br />18.48.160 Permitted Uses-L-I <br />District: <br />The following uses shall be permitted in <br />an L-I district: <br />Accessory structures and uses located on <br />the same site as a permitted use and the <br />following accessory structures and uses <br />located on the same site with a permitted <br />use or with a conditional use which has <br />been granted a use permit in accord with <br />the provisions of chapter 18.124 of this <br />title: <br />A. Emergency standby electricity gen- <br />erator, fuel cell, and/or battery facilities <br />provided that the facilities shall be tested <br />from eight o'clock (8:00) A.M. to five <br />o'clock (5:00) P.M. Monday through Fri- <br />day or from ten o'clock (10:00) A.M. to <br />twelve o'clock (12:00) noon on Saturday <br />or Sunday only; the facilities shall not be <br />tested for more than one hour during any <br />day, and no testing shall be on "Spare The <br />Air Days" in Alameda County. <br />B. Photovoltaic facilities. <br />C. Small electricity generator facilities <br />that meet the following criteria: <br />1. The fuel source for the generators <br />shall be natural gas, biodiesel, or the by- <br />product of an approved cogeneration or <br />combined cycle facility; <br />2. The facilities shall use the best avail- <br />able control technology to reduce air pollu- <br />tion; <br />3. The facilities shall not create any <br />objectionable odors at any point outside of <br />the property plane where the facilities are <br />located; <br />4. The facilities shall not exceed a <br />noise level of forty-five (45) dBA at any <br />point on any residentially zoned property <br />outside of the property plane where the <br />facilities are located; and <br />5. On a site with fuel cell facilities, <br />small electricity generator facilities shall <br />not be permitted unless the aggregate watt- <br />age of the two (2) facilities is less than one <br />megawatt. If the aggregate wattage of the <br />two (2) facilities is one megawatt or <br />greater, the small electricity generator fa- <br />cilities shall be subject to all requirements <br />and processes prescribed in this title for <br />medium or large electricity generator fa- <br />cilities, whichever is the most applicable, <br />in the subject zoning district; <br />6. The facilities shall be cogeneration <br />or combined cycle facilities, if feasible. <br />D. Small fuel cell facilities that meet <br />the following criteria: <br />(Pleasanton Supp. No. 19, 9-07) 536 <br />