Laserfiche WebLink
minimum requirements for the benchmark classes are comparable among the survey agencies, not <br />merely classification titles. <br />Six (6) months prior to the expiration of the Memorandum of Understanding, LPFD will meet and <br />confer with the Union as to the Agencies from the Bay Area be surveyed. Total Compensation arrays <br />will be provided to the Union representative three (3) months prior to the expiration of the Memorandum <br />of Understanding. <br />Section 31. Hazardous Material Response Team <br />The Department intends to maintain the ability to respond to and mitigate hazardous materials (Haz Mat) <br />incidents above the first responder level. To accomplish this, the Department will train and staff each <br />shift with four Hazardous Materials Specialists. <br />31.1 Hazardous Materials Staffing <br />Each shift will be staffed with, 1 Hazardous Materials Captain, 1 Hazardous Materials Engineer, 1 <br />Hazardous Materials Firefighter/Paramedic and 1 Hazardous Materials Firefighter. <br />31.2 Compensation <br />Personnel assigned to the Hazardous Materials Response Team will be compensated at five percent (5 %) <br />above their respective base rates of pay, subject to MOU Section 5.1. <br />31.3 Training <br />The Department shall provide a minimum of twenty -four (24) hours training for Haz Mat Team <br />members per year. This training can be a combination of in house and outside training. However, the <br />twelve Primary team members will train together eight (8) hours a year (as part of the minimum 24 <br />hours), as a complete team. The balance of training may be with Primary and Back -up team members or <br />as individuals with assigned study. Haz Mat continuing education hours do not count towards <br />promotional career development continuing education requirements. The Hazardous Materials Team <br />Coordinator shall determine the specific type of training. <br />31.4 Hazardous Materials Assignments <br />Minimum staffing shall be two (2) specialists on duty at all times. Of this one (1) specialist must be one <br />of the twelve Primary team members. <br />The Local understands that it is beneficial to its membership and the Department to maintain a reserve <br />pool of trained Hazardous Materials response personnel. As such, the local will agree to the Department <br />maintaining such a pool of trained personnel. <br />The Department may maintain up to four members per shift of any rank for the Hazardous Materials <br />Back -up Team. These personnel may be specialists or technicians and will be chosen by seniority in <br />rank. <br />34 <br />