My WebLink
|
Help
|
About
|
Sign Out
14 ATTACHMENT 04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
052008
>
14 ATTACHMENT 04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2008 2:39:06 PM
Creation date
5/15/2008 2:39:03 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
5/20/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
14 ATTACHMENT 04
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
83. Prior to Final Map approval, the developer shall obtain from the East Bay Regional <br />Pazk District the land necessary to complete the right-of--way for the Foothill Road <br />deceleration lane. <br />84. On the Final Map, the developer shall dedicate to the City for street right-of--way <br />purposes those parcels of land intended to be public streets and shall provide an <br />open offer of dedication of the land necessary for the widening of Foothill Road <br />into a four lane street as determined by the City Engineer. <br />85. On the Final Map, the developer shall grant an easement to the City over the pri- <br />vate roads and emergency vehicle accesses. <br />86. The property owners to the north who currently have access rights over the exist- <br />ing private road shall be granted on the Final Map access rights to the new private <br />road on the north side of the subdivision. The easement shall encompass the entire <br />length and width of the new private road from where it intersects the public road <br />leading into the development to where it intersects with the existing easement by <br />the hammerhead at the western end of the private road. All access easements on <br />the existing private road which run from Foothill Road to the new private road <br />shall be removed when the new access easement is recorded. <br />87. The developer shall grant an easement on the Final Map to the City over those paz- <br />cels needed for public service easements (P.S.E.) and which are approved by the <br />City Engineer or other easements which may be designated by the City Engineer. <br />88. The developer shall submit a fmal grading and drainage plan prepared by a li- <br />censed civil engineer depicting all fmal grades and on-site drainage control meas- <br />ures, including concrete-lined V-ditches, to protect all cut and fill slopes from <br />surface water overflow. This plan shall be subject to the review and approval of <br />the City Engineer prior to approval of the Final Map. <br />89. Prior to Final Map approval, the developer shall contribute its pro-rata share to the <br />Dublin Canyon Road/Foothill Road intersection and the Canyon Way/Foothill <br />Road intersection improvements as determined by the City Engineer. <br />90. Prior to Final Map approval, the developer shall install a five strand barbed wire <br />fence on the north side of the drainage Swale north of the private road on the East <br />Bay Regional Park District's land to the park district's standards. The location of <br />the barbed wire fence shall be subject to the review and approval of the Planning <br />Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.