Laserfiche WebLink
ATTACHMENT B <br />RAILROAD QUIET ZONES – DESIGN ONLY <br />PROJECT DESCRIPTION: <br /> This project provides design for the creation of railroad quiet <br />zones along at-grade railroad crossings through downtown Pleasanton and at Castlewood <br />Drive. The current practice is for trains running through at-grade crossings to sound their <br />horns as a precautionary safety measure to warn pedestrians and vehicular traffic. In order <br />to provide an acceptable alternative to the use of horns, the existing at-grade crossings <br />would need to be upgraded to provide four gates to essentially block all potential traffic and <br />pedestrian movements across the respective railroad tracks. The five quiet zone locations <br />under consideration include: Santa Rita Road, St. Mary Street, Rose Avenue, West Angela <br />Street and Castlewood Drive. Total project costs and funding will be determined following <br />project evaluation and design <br />PROJECT JUSTIFICATION: <br /> In October of 2007, the City Council directed that this project <br />be considered as part of the midyear review of the Capital Improvement Project Plan. <br />PROJECT COST ESTIMATE <br />ItemCostFundingSource <br />Design$150,000StreetsGeneral Fund CIP $150,000 <br />CIP #:CATEGORY: RECOMMENDATION: <br />088020 StreetsFund in 2008-2009 <br />SIDEWALK / ADA RAMP ASSESSMENT - CITYWIDE <br />PROJECT DESCRIPTION: <br /> Recent standards for ADA ramps have been modified requiring <br />the installation of detectable warning surfaces on all ramps. Additionally, any street <br />resurfacing project now requires adjacent sidewalks and pathways be brought up to current <br />ADA standards. The City does not have an accurate inventory of the condition of existing <br />sidewalks and ADA ramps. Existing sidewalks become damaged through normal wear and <br />tear and adjacent tree roots that crack and lift sidewalks, creating potential tripping hazards. <br />It is therefore recommended that funding be allocated to conduct a study of our budgetary <br />needs to maintain the City’s sidewalk network in compliance with current ADA standards. <br />PROJECT JUSTIFICATION: <br /> To provide a safe network of pedestrian sidewalks, it is <br />recommended that a study be funded to evaluate the City’s sidewalk system and identify the <br />potential yearly costs to adequately maintain the system and bring the system up to current <br />ADA standards. <br />PROJECT COST ESTIMATE <br />ItemCostFundingSource <br />Consultant Fees $100,000Street funding - Gas Tax $100,000 <br />CIP #:CATEGORY: RECOMMENDATION: <br />078019 StreetsFund in FY 2008-2009 <br />êí <br /> <br />