Laserfiche WebLink
14.3 The Member Agencies will, individually and collectively, actively resist <br />any other governmental agency requiring a Member Agency to provide <br />wastewater or disposal service to any unincorporated areas other than <br />the areas described herein. <br />Paragraph 15. Piyeline Project. <br />15.1 Project Description. Upon execution of this Agreement, the Member <br />Agencies shall initiate the Project, which includes an export pumping <br />and pipeline expansion that increases the total design capacity of the <br />LAVWMA system to 41.2 mgd PWWF. The Project shall consist of an <br />expansion component and a repair component. The expansion com- <br />ponent includes a new pipeline which is intended to have a design <br />capacity of 21 mgd PWWF, an expanded export pumping station and, at <br />the appropriate time, a Livermore funded pump station and possible <br />improvements to the LAVWMA sole use interceptor. Construction of <br />the new pipeline shall be followed immediately by the repair compo- <br />nent consisting of the relining of the existing pipeline which is intended _ <br />to have a design capacity of 20.2 mgd PWWF. <br />15.2 PWWF Capacity The total PWWF design capacity of the Project is 41.2 <br />mgd. If all Member Agencies participate in the Project, the P W W F <br />capacity shall be allocated as follows: Livermore 12.4 mgd; Pleasanton <br />14.4 mgd; and DSRSD 14.4 mgd; and the expansion increment of the Pro- <br />ject shall be: Livermore 3.672 mgd; Pleasanton 6.897 mgd; and DSRSD <br />9.631 mgd. Any Member Agency that does not participate in the Project <br />retains its right to utilize its existing PWWF capacity in the L A V W M A <br />pipeline(s) and related facilities which is: Livermore 8.728 mgd; Pleasan- <br />ton 7.503 mgd; and DSRSD 4.769 mgd. Two Member Agencies may <br />transfer between them a portion of their PWWF allocation upon <br />mutual agreement. <br />15.3 Project A va s_ LAVWMA is committed to validating this Agree- <br />ment and to implementing the Project at the earliest date feasible, <br />consistent with compliance with applicable engineering, financial, envi- <br />ronmental and other regulatory requirements. LAVWMA will prepare <br />the studies, reports, findings and other documents necessary for action <br />on the Project ("Project approvals"), including environmental review, a <br />financing plan, and a resolution and findings authorizing implementa- <br />tion of the Project. <br />15.4 Validation Action. <br />15.4.1 Promptly following adoption of this Agreement, L A V W M A <br />shall initiate a validation action to establish the legal validity of <br />LAVWMA/JPA/FINAL -9- July 21, 1997 <br />