Laserfiche WebLink
B-2 <br />standard installation), to all of the public buildings listed in Figure 1 of this <br />Exhibit. Public buildings listed in Figure 1 of this Exhibit that have Basic Cable <br />Service as of the effective date of this Agreement shall continue to receive Basic <br />Cable Service. As used above, an "offer" of the connection and Basic Cable <br />Service will have been deemed to have been made if, upon Grantor request, <br />documentation of such an offer is provided to Grantor by Grantee in the form of <br />written evidence from an authorized representative of the public building at issue <br />detailing the desire on the part of the authorized representative to either decline <br />or defer the provision of the free connection and service. <br />3. Upstream Video Capacity <br />(a) For the term of this Agreement, Grantee shall continue to provide <br />upstream fiber optic links from the following locations: <br />(1) From Pleasanton City Hall to CN. <br />(2) From CN located at 4663 B Bernal, Studio B, Pleasanton, to the <br />AT&T Cable System headend. <br />The purpose of these upstream communications links is to permit live <br />cablecasting of video and audio programming from those locations on Grantee's <br />Cable System. Grantee shall not charge Grantor for any of the costs associated <br />with providing this links. <br />(b) During the term of this Agreement, Grantor may request, in writing <br />and at least one hundred twenty (120) days in advance, and Grantee shall <br />provide, one (1) additional upstream fiber optic communications link to a public <br />facility within the City: If this location is more than one hundred twenty-five (125) <br />feet from Grantee's nearest Cable plant, Grantee may charge, on a time and <br />materials basis, for the incremental actual cost associated with the distance <br />