My WebLink
|
Help
|
About
|
Sign Out
09 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2009
>
021709
>
09 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2009 1:21:44 PM
Creation date
2/12/2009 4:35:29 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/17/2009
DESTRUCT DATE
15 Y
DOCUMENT NO
09 ATTACHMENTS
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
^ CORNERSTONE --- - <br />L: EARTH GROUP <br />4.6.2 Method of Analysis .....................................................................................................8 <br />4.6.3 Soil Properties .............................................................................................................8 <br />Table 2: Summary of Soil Strength Properties (Total Stress Parameters) .........................9 <br />4.6.4 Results of the Analysis ...............................................................................................9 <br />Table 3: Results of Slope Stability Analyses ........................................................................9 <br />4.6.5 Slope Deformation Analysis .......................................................................................9 <br />4.7 Flooding-----------------------------------°------------------------°--------------°---------------------- 10 <br />SECTION 5: CONCLUSIONS .....................................................................................................10 <br />5.1 Undocumented Fills------------------------------------------------------------------------------------- 11 <br />5.2 Moisture-Sensitive soils --------------°-------.....__....--°-----°----------------------°---°----- 11 <br />5.3 Plans and Specifications Review ------------------------------------------------------------------- 11 <br />5.4 Construction Observation and Testing ----------------------------------------------------------- 11 <br />SECTION 6: EARTHWORK .......................................................................................................11 <br />6.1 Site Demolition, Clearing and Preparation------------------------------------------------------- 11 <br />6.1.1 Site Stripping .............................................................................................................11 <br />8.1.2 Tree and Shrub Removal ..........................................................................................12 <br />6.1.3 Abandonment of Existing Utilities ...........................................................................12 <br />6.2 Removal of Existing Fills ------------------------------------------------------------------------------ 12 <br />6.3 Temporary Cut and Fill Slopes----------------------------------------------------------------------- 13 <br />6.4 Subgrade Preparation -----------------------------------------------------------------------------°--- 13 <br />6.5 Subgrade Stabilization Measures------------------------------------------------------------------- 13 <br />6.5.1 Scarification and Drying ...........................................................................................14 <br />6.5.2 Removal and Replacement .......................................................................................14 <br />6.5.3 Chemical Treatment ..................................................................................................14 <br />6.6 Material for Fill -----------------------------------°--------------------------------------....------------- 14 <br />6.8.1 Re-Use of On-site Soils .............................................................................................14 <br />6.8.2 Potential Import Sources ..........................................................................................14 <br />6.7 Compaction Requirements----------------------------------------------------------------------°---- 15 <br />Table 4: Compaction Requirements .....................................................................................15 <br />6.8 Trench Backfill-------------------------------------°----------------------------------------------------- 16 <br />6.9 Permanent Cut and Fill Slopes--------•-------------------------------------------------------------- 16 <br />Ponderosa Active Adult Community Page ii <br />132-2-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.