My WebLink
|
Help
|
About
|
Sign Out
09 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2009
>
021709
>
09 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2009 1:21:44 PM
Creation date
2/12/2009 4:35:29 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/17/2009
DESTRUCT DATE
15 Y
DOCUMENT NO
09 ATTACHMENTS
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CORNERSTONE <br />C. EARTH GROUP <br />5.1 UNDOCUMENTED FILLS <br />Although undocumented fill was not encountered in our borings, we observed numerous soil <br />stockpiles and/or loose soil spread across portions of the site. This material could possibly be <br />reused as engineered fill provided any organic or deleterious material, such as asphalt or <br />debris, is removed from the stockpiles. Detailed recommendations for mitigating undocumented <br />fills are provided in the "Earthwork" section. <br />5.2 MOISTURE-SENSITIVE SOILS <br />Portions of the site are blanketed by low plasticity silts and clays that are sensitive to changes in <br />moisture content above the laboratory optimum. Silty and clayey soils will likely become soft <br />and unstable under the weight of construction equipment during periods of heavy rain or when <br />excessively moisture conditioned. Additional guidelines addressing this concern are presented <br />in the "Earthwork° section. <br />5.3 PLANS AND SPECIFICATIONS REVIEW <br />We recommend that we be retained to review the geotechnical aspects of the project structural, <br />civil, and landscape plans and specifications, allowing sufficient time to provide the design team <br />with any comments prior to issuing the plans for construction. <br />5.4 CONSTRUCTION OBSERVATION AND TESTING <br />As site conditions may vary significantly between the small-diameter borings performed during <br />this investigation, we also recommend that a Cornerstone representative be present to provide <br />geotechnical observation and testing during earthwork and foundation construction. This will <br />allow us to form an opinion and prepare a letter at the end of construction regarding contractor <br />compliance with project plans and specifications, and with the recommendations in our report. <br />We will also be allowed to evaluate any conditions differing from those encountered during our <br />investigation, and provide supplemental recommendations as necessary. For these reasons, <br />the recommendations in this report are contingent of Cornerstone providing observation and <br />testing during construction. Contractors should provide at least a 48-hour notice when <br />scheduling our field personnel. <br />SECTION 6: EARTHWORK <br />6.1 SITE DEMOLITION, CLEARING AND PREPARATION <br />6.1.1 Site Stripping <br />The site should be stripped of all surface vegetation, and surface and subsurface improvements <br />within the proposed development area. A detailed discussion of removal of existing fills is <br />provided later in this report. Surface vegetation and topsoil should be stripped to a sufficient <br />depth to remove all material greater than 3 percent organic content by weight. Based on our <br />site observations, surficial stripping should extend about 1 to 3 inches below existing grade. At <br />Ponderosa Active Adult Community Page 11 <br />132-2-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.