C CORNERSTONE <br />EARTH GROUP <br />6.3 TEMPORARY CUT AND FILL SLOPES <br />The contractor is responsible for maintaining all temporary slopes and providing temporary <br />shoring where required. Temporary shoring, bracing, and cuts/fills should be performed in <br />accordance with the strictest government safety standards. On a preliminary basis, the upper <br />10 feet at the site may be classified as OSHA Site C materials. <br />Excavations performed during site demolition and fill removal should be sloped at 3:1 <br />(horizontal:vertical)tyithin the upper 5 feet below building subgrade. Excavations extending <br />more than 5 feet below building subgrade and excavations in pavement and flatwork areas <br />should be slope at a 1:1 inclination unless the OSHA soil classification indicates that slope <br />should not exceed 1.5:1. <br />6.4 SUBGRADE PREPARATION <br />After site clearing and demolition is complete, and prior to backfilling any excavations resulting <br />from fill removal or demolition, the excavation subgrade and subgrade within areas to receive <br />additional site fills, slabs-on-grade and/or pavements should be scarified to a depth of 6 inches, <br />moisture conditioned, and compacted in accordance with the "Compaction" section below. <br />6.5 SUBGRADE STABILIZATION MEASURES <br />r' Soil subgrade and fill materials, especially soils with high fines contents such as clay and silt <br />\_ materials, can become unstable due to high moisture content, whether from high in-situ <br />moisture contents or from winter rains. As the moisture content increases over the laboratory <br />optimum, more likely the materials will be subject to softening and yielding (pumping) from <br />construction loading or become unworkable during placement and compaction. <br />As discussed in the "Subsurface" section in this report, the in-situ moisture contents are about 5 <br />to 8 percent below to 5 percent over the estimated laboratory optimum in the upper 10 feet of <br />the soil profile. The contractor should anticipate moisture conditioning the soils prior to reusing <br />them as fill; however, moisture contents greater than 2 percent above the laboratory optimum <br />will likely cause silty and clayey soils to begin "pumping" under the weight of construction <br />equipment. In addition, repetitive rubber-tire loading will likely further de-stabilize the soils. <br />During winter construction, areas that are prone to water-related impacts typically include <br />undercut street subgrade areas, cul-de-sac or "hammer-head" streets, or other low areas where <br />surface water runoff is likely to pond. Utility crossings where native soil backfill materials are <br />used can also be susceptible to deflection under the weight of construction equipment. These <br />areas are typically difficult to dry out after winter rains due to saturated subgrade soils that often <br />extend to depths on the order of 24 to 48 inches below finished subgrade. <br />There are several methods to address potential unstable soil conditions and facilitate fill <br />placement and trench backfill. Some of the methods are briefly discussed below. <br />Implementation of the appropriate stabilization measures should be evaluated on a case-by- <br />case basis according to the project construction goals and the particular site conditions. <br />Ponderosa Active Adult Community Page 13 <br />132-2-1 <br />