My WebLink
|
Help
|
About
|
Sign Out
09 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2009
>
021709
>
09 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2009 1:21:44 PM
Creation date
2/12/2009 4:35:29 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/17/2009
DESTRUCT DATE
15 Y
DOCUMENT NO
09 ATTACHMENTS
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 4 <br />PUD-74, Ponderosa Homes <br />Application for Planned Unit Development (PUD) development plan to construct <br />110 detached single-family homes for residents aged 55 years and older at the <br />public school option/Medium Density Residential-senior housing site located at 1 <br />Reimers Drive in the Ironwood Development. Zoning for the property is <br />PUD-LDR/MDR/HDR/ P&I & Mixed P&IIMDR (Planned Unit Development -Low <br />Density Residential/Medium Density Residential/ High Density Residential/Public <br />& Institutional and Mixed Public & Institutional/Medium Density Residential) <br />District. <br />Also consider the Negative Declaration prepared for the project. <br />Chair Blank indicated that he had the staff report from the previous hearing and <br />confirmed with staff that the staff report from the last hearing and this one were <br />identical. <br />Steve Otto replied that they were identical. He noted that the item was continued from <br />the last meeting by Commissioner Fox in order to have the public noticed area <br />expanded, which staff has done for the present hearing. He then summarized the staff <br />report and described the background, scope, and layout of the proposed project. <br />Mr. Otto noted that staff has received several emails both in opposition and support of <br />the project which have been forwarded to the Commission for consideration. He added <br />that staff has also provided responses to the email submitted by Nancy Allen in a memo <br />distributed to the Commission, and the applicant has met with resident Jereen Gilbert to <br />discuss the project, as well. <br />Mr. Otto noted the City's Traffic Engineer was present to answer any questions. <br />Commissioner Narum referred to page 13 of the staff report and asked Mr. Otto to <br />clarify whether Lots 10-13 and 16-17 have a retaining wall built at the back of the lots. <br />She assumed that the slope of the grade would go from the back to the front. <br />Mr. Otto replied that there is a retaining wall proposed near the property line. He noted <br />that the lots of the existing development are higher than the proposed lots, so there <br />would be a retaining wall on two of the lots. He added that on the other lots mentioned <br />in the section of the staff report, the applicant is proposing a 2:1 slope versus having a <br />retaining wall. He stated that staff felt that in order to maximize a flat area of the rear <br />yard, retaining walls could be put on those lots that have the 2:1 slope bank versus <br />expanding the rear yard areas. He indicated that if they were not put in, residents would <br />most likely want to install them and staff believed having the developer do this atone <br />time would improve their overall structural soundness, as homeowners may not pull <br />permits for the work. <br />Commissioner Narum inquired which way the drainage would go on the lots, and <br />Mr. Otto said if a retaining wall is installed, they would typically have a French drain to <br />EXCERPTS: PLANNING COMMISSION MINUTES, July 9, 2008 Page 1 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.