My WebLink
|
Help
|
About
|
Sign Out
09 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2009
>
021709
>
09 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2009 1:21:44 PM
Creation date
2/12/2009 4:35:29 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/17/2009
DESTRUCT DATE
15 Y
DOCUMENT NO
09 ATTACHMENTS
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Utilization (ICU) which does not take into account as many factors. He noted that the <br />table uses HCM average-controlled delay information and that the ICU is more on how <br />well each lane is being utilized and not as much of a clear function of how an <br />intersection operates. <br />Commissioner Fox noted that Santa Rita Road and Valley Avenue now have HCM <br />LOS E on page 1 of the Existing Plus Approved Plus Project PM peak. She questioned <br />why the boxes in the Mitigated Negative Declaration are not checked when it conflicts <br />with the General Plan, since HCM LOS D is accepted in the Downtown. Mr. Tassano <br />replies that the mitigation has been established and the fees pay for the mitigation. He <br />added that staff would not require this project to construct this mitigation as it is a very <br />small-scale improvement; staff holds larger-scale projects to doing full construction. <br />Commissioner Fox questioned what the difference was between small- and large-scale <br />construction. Mr. Tassano replied that small-scale adds 25 trips orone-second of delay <br />to an intersection. He noted that the City Council has in the past moved forward with <br />approving projects of this nature as there is future mitigation planned for this <br />intersection. <br />Commissioner Fox questioned the status of the Valley Avenue and Stanley Boulevard <br />intersection, which had ICM LOS F. Mr. Tassano replied that this will not be improved <br />as a result of what the ICM looks at, but the City does have improvements to be <br />constructed by Ponderosa with a free westbound right-turn lane. He added that there <br />will also be a third eastbound through lane at that intersection. <br />Commissioner Narum referred to Table 2 on page 8, ID No. 5, Busch Road/Ironwood <br />Drive, and noted that it looks like as with Currently Approved Projects plus this new <br />project, traffic gets better, which she did not believe was obvious. Mr. Tassano replied <br />that the entire table of existing conditions is not an optimized intersection. He noted that <br />staff put the numbers in, and it could actually be a C if the lengths of time for a left turn <br />are wrong. He stated that when considering traffic volumes, staff looks at the delay per <br />vehicle. He explained that if a large volume of traffic is going to turn right and it is a free <br />right-turn movement and there is no delay, once that right turn is made and the vehicle <br />goes through the intersection, there would be zero delay for that vehicle. He added that <br />if there are only 100 vehicles that have already gone through that intersection, and staff <br />adds another 100 right-turn vehicles and they all get to turn for free, there would now be <br />200 vehicles and no delay has been added. He noted that in this sense, the overall <br />average delay per vehicle has actually dropped. He stated that this is usually pretty <br />minor and that A and B intersections usually operate so well that minor variations do not <br />affect them. <br />Commissioner Narum referred to page 9 of the report, stating the traffic engineering <br />consultant recommends that stops signs as well as a warning sign be installed leading <br />into Reimers Drive. She stated that she did not see this in the conditions. Mr. Tassano <br />noted that this is done through the design review process when the developer submits <br />the signing and striping plan. <br />EXCERPTS: PLANNING COMMISSION MINUTES, July 9, 2008 Page 5 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.