Commissioner Narum referred to Ms. Hardy's discussion regarding traffic mitigations <br />and inquired if these were underway or planned. Ms. Hardy replied that the majority of <br />the traffic mitigations have already been constructed by Ponderosa over the last several <br />years, with the exception of only two -the free right-turn lane at Valley Avenue/ Stanley <br />Boulevard/Bernal Avenue described earlier and the intersection improvement at the <br />First Street/Sunol Boulevard/ Bernal Avenue intersection near the Downtown area. She <br />added that Ponderosa is currently working diligently with staff on the free right-turn lane, <br />which has taken a little longer than expected due to an interface process with Union <br />Pacific Railroad. With respect to the Downtown area mitigation, she noted that <br />Ponderosa is still waiting for the City's direction as to when it would like Ponderosa to <br />begin that process. <br />Chair Blank indicated that he understood Ms. Hardy's comments on the Conditions of <br />Approval Nos. 18.c. and 69 but did not understand that on Condition No. 1. He asked <br />Ms. Hardy if she believed Ponderosa could not be in substantial conformance to what <br />has been submitted for LEEDS points. Ms. Hardy replied that the threshold for <br />compliance is 50 points and that this project is substantially greater than that. She <br />notes that Ponderosa would not have typically anticipated providing this information at <br />this preliminary design phase and would have more information at the building permit <br />submittal process, at which time Ponderosa would have had the chance to get more <br />information and bid analysis from their subcontractors. She noted that she understand <br />it to be a preliminary planning tool and would like to go on record that the project may <br />not be at the actual 100-point range. <br />Chair Blank indicated that the Commission has been more flexible with projects that had <br />200 LEED points and that it would be acceptable if Ponderosa would propose 100 <br />LEED points and came in at 90 or 105. He noted, however, that if the project came in at <br />50 points, his personal flexibility would be reduced. <br />Ms. Hardy said that there is every expectation that the project would be in substantial <br />conformance, although she could not confirm the exact number at the time. She <br />reminded the Commission that the Ironwood project was the very first green project <br />approved in Pleasanton. <br />Chair Blank expressed his appreciation for Ponderosa's amenability to install sprinklers. <br />Jereen Gilbert stated that many people could not be present at the meeting because of <br />the late notice to surrounding neighborhoods and that she would be representing two <br />groups of people. She said that she did not want to be involved but that she needed to <br />do so as a parent. She indicated that people are very frustrated with City government <br />as thousands of people have discussed the circulation issues at the intersection at <br />Santa Rita and Valley Avenue with Council and Commission members and no <br />measures are being taken to mitigate them. She noted that many children are getting <br />hit at the intersection of Santa Rita Road and Mohr Avenue. She stated that she <br />believes the frustration is that people have said things they want considered, <br />neighborhoods have come together and have recognized the limitations given the <br />EXCERPTS: PLANNING COMMISSION MINUTES, July 9, 2008 Page 11 of 20 <br />