Laserfiche WebLink
PUD-74 Environmental Checklist <br />10. MINERAL RESOURCES <br />Environmental Setting <br />The subject site has not been identified to have mineral resource deposits. <br />Standards of Significance <br />For purposes of this environmental document, an impact is considered significant if the proposed <br />project would: <br />Result in the depletion of a mineral resource. <br /> Less Than <br />Potentially Significant Less Than <br />Significant With Mitigation Significant No <br />Issues Impact Incorporated Impact Impact <br />Mineral Resources <br />Would the project: <br />a) Result in the loss of availability of a known ~ ~ ~ ~X <br />mineral resource that would be of value to the <br />region and the residents of the state? <br />b) Result in the loss of availability of a locally- ~ ~ ~ ~X <br />important mineral resource recovery site <br />delineated on a local general plan, specific plan <br />or other land use plan? <br />Discussion <br />a,b) The proposed project site is not included or delineated as a Mineral Resource Zone. <br />Mining has not occurred on the project site, and implementation of the project would not <br />affect the availability of any mineral resource. Therefore, this would be categorized as <br />no-impact. <br />11. NOISE <br />Environmental Setting <br />External noise sources that could affect the site include noise from the City's Operation Service <br />Center (OSC) to the south, sand and gravel operations to the east, Livermore Municipal Airport, <br />traffic on adjacent City streets, Pleasanton Garbage Service transfer station, Kiewit Construction <br />and Utility Vault facilities, and other adjacent land uses. Seven-foot tall masonry walls aze <br />currently located along the site's southern and western boundaries. The existing seven-foot tall <br />wall along the southern boundary would be removed and replaced with a new seven-foot tall <br />27 <br />