Laserfiche WebLink
2) Auto Mall Place as a four lane divided road with tum lanes from El Charro Road to a <br />new signalized intersection at the entrances to the Auto Mall and Retail/Commercial <br />sites. Roadway improvements include all improvements up to the back of curb, median <br />landscaping, street lighting, a traffic signal, and all public utility extensions located <br />within the road right of way, including stubouts to adjacent development and park sites. <br />3) All improvements, up to the back of curb, within the gated Emergency Vehicle <br />Access (EVA) area separating Auto Mall Place and Stoneridge Drive, including an <br />emergency vehicle lane with an automated gate, pedestrian walkway, bicycle access, <br />public utility extensions and appropriate landscaping treatment. <br />4) All public utility extensions within and adjacent to Staples Ranch required for Staples <br />Ranch development that are located within the right of way of Stoneridge Drive, Auto <br />Mall Place, El Charro Road, and Staples Ranch Drive, including water, sewer, storm <br />drainage, and joint trench improvements, and their required separate or public services <br />easements as determined by the City Engineer. The ACSPA will also fund the design of <br />the Neighborhood Park storm water flow control basin so that it will function as part of <br />the overall storm water system, in compliance with Clean Water Program requirements. <br />The ACSPA will also fund half of the El Charro Road improvements and a portion of off <br />site flood control improvements in Livermore, as described and stipulated in the Cost <br />Sharing Agreement. El Charro Road improvements include six lanes with turn lanes <br />between I -580 and a signalized Jack London Boulevard/Auto Mall Place intersection, and <br />a transition back to a two lane private quarry road south of the intersection. The planned <br />El Charro Road improvements discussed above are within the Stoneridge Drive Specific <br />Plan area, and if not constructed by Livermore prior to Pleasanton's annexation of Staples <br />Ranch, will be constructed in Pleasanton by the ACSPA (under the Development <br />Agreement with the City of Pleasanton) as part of the Staples Ranch circulation <br />improvements. <br />In addition, the ACSPA shall dedicate to the City of Pleasanton the 17 acre Community <br />Park site, right of way for El Charro Road improvements from I -580 to the Arroyo Las <br />Positas/Arroyo Mocho channel, right of way for the Auto Mall Place /Stoneridge Drive <br />alignment sufficient for a four lane future extension (with turn lanes) to El Charro Road, <br />and any right of way necessary for the El Charro Road interchange ramp improvements. <br />Staples Ranch Developer Responsibilities: Each developer within Staples Ranch, <br />including park site developer(s), shall be responsible for: <br />Stoneridge Drive Specific Plan Amendment /Staples Ranch <br />Draft October, 2008 <br />62 <br />r <br />r <br />