Laserfiche WebLink
they met the neighbors more than halfway. He stated that he felt the most critical <br />issues were the height and massing of the building from 47 feet high and four stories <br />to 32 feet high and two stories; the orientation of the building, moving the front door <br />from Pleasant Hill Road to Stoneridge Drive; and traffic and vehicular access, <br />moving the egress onto Foothill Road and relocating the service area farther away <br />from the neighbors to the other side of the building with access onto Foothill Road. <br />He noted that the setback from Pleasant Hill Road was increased by more than <br />15 percent. He added that he believed that articulating the building with quality <br />materials, roofing, and other elements demonstrated ahigh-quality project that <br />enhances the neighborhood. <br />David Gates, project landscape architect, stated that there are differences between <br />the previous scheme and the proposed design. He noted that there is now a riparian <br />corridor with vegetation that is 50 to 80 feet tall, and what was an activity front facing <br />the neighbors became a 50-percent reduction in parking and more than a football <br />field of landscaping, set back farther and lower so that the activity indrop-off and <br />service was split and relocated away from the neighbors. He noted that the <br />landscaping is soft, and the building is designed so that the closer elements are <br />small and then recedes to towers, which provides articulation. He added that there is <br />a grade difference between the project site and Foothill Road so that Foothill Road <br />sits five feet above the site, and the parking, which was one large lot that wrapped <br />around, is now broken into two sections. <br />With respect to architecture, Mr. Gates stated that there are roof rafters and braces <br />and a fair amount of stone, which will break the scale with the shingles and provide a <br />(Bernard) Maybeck historical character that works with the vegetation. He noted that <br />the building has a lot more light than what the graphics actually show. <br />Mr. Rockwood concluded by stating that Sunrise is the best senior housing that is <br />yet to be invented and that they are always looking for ways to do better. He <br />indicated that he believes this project will be the nicest they have ever done. With <br />respect to Commissioner Fox's inquiring regarding provisions forAlzheimer patients, <br />Mr. Rockwood stated that there would be about 29 units or approximately 1/3 of the <br />total number of units. <br />Commissioner O'Connor stated that he liked the architecture and felt the revised <br />plan is a huge improvement and is impressive and goes well with the surrounding <br />area. <br />Chair Blank stated that diagrams L.1.4 through L.1.6 were nicely done and that he <br />liked L.1.5's lighter roof as an element. He noted that the roof material looked to be <br />very dark in material and did not look like a Pleasanton residential roof, which was <br />typically of a lighter color. <br />Commissioner O'Connor noted that the roof of the Lemoine Ranch homes was <br />asphalt. <br />PLANNING COMMISSION MINUTES, December 10, 2008 Page 27 of 35 <br />