My WebLink
|
Help
|
About
|
Sign Out
SCHUERING ZIMMERMAN & DOYLE
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
S
>
SCHUERING ZIMMERMAN & DOYLE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2026 2:48:38 PM
Creation date
10/7/2026 2:47:52 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
11/22/2021
LONG TERM AGREEMENTS - NAME
SCHUERING ZIMMERMAN & DOYLE
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
LONG TERM AGREEMENTS - NOTES
ENCROACHMENT AGREEME
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIRST AMENDMENT TO <br />ENCROACHMENT AGREEMENT FOR MONITORING WELLS <br />Area of 555 Main Street, Pleasanton CA <br />THIS FIRST AMENDMENT TO ENCROACHMENT AGREEMENT FOR <br />MONITORING WELLS ("Amendment") is entered into 3 J1 S , 20231 by and <br />between the City of Pleasanton ("City"), Schuering Zimmerman & Doyle, LLP ("SZD"), and <br />EKI Environment & Water, Inc., a California corporation ("Consultant"). <br />RECITALS <br />WHEREAS, City, SZD and Consultant entered into an Encroachment Agreement for <br />Monitoring Wells on November 22, 2021 (the "Agreement"); and <br />WHEREAS, SZD now needs to install five (5) additional monitoring wells and has hired <br />Consultant to install, inspect, maintain and obtain samples from such monitoring wells; <br />WHEREAS, on 3 / 3 v 12 C Z _) , the City approved Encroachment Permit # E23 <br />0115 (the "Second Encroachment Permit") to allow Consultant to install and maintain these five <br />(5) additional monitoring wells approximately two 2-inch casings inside a 10 5/8" OD borehole <br />with 12-inch flush mounted well box to be installed and maintained flush with the sidewalk or <br />pavement, as applicable, on City streets, sidewalks, Rights of Way and PSE, at the locations <br />shown on Exhibit A for the purpose of soil vapor sampling (the "Expanded Project") in order to <br />allow Consultant to monitor conditions related to the San Francisco Bay Regional Water Quality <br />Control Board case referenced in the Agreement. <br />NOW, THEREFORE, in consideration of the faithful performance of the terms and <br />conditions contained in this Amendment, the City, SZD and Consultant agree as follows: <br />1. City shall allow Consultant to install, inspect and maintain the Expanded Project in the <br />Right of Way and PSE as shown on the attached Exhibit A. <br />2. Section 5., Subsection (a)(1) is amended to require that Consultant post a performance <br />bond in the amount of $36,675.50 for both the Project and the Expanded Project. The Consultant <br />can provide a second bond for just the Expanded Project and maintain the existing bond for the <br />Project; or the Consultant may replace the existing bond for the Project with a single bond for <br />both the Project and Expanded Project. <br />3. All of the terms and conditions of the Agreement shall apply to this Amendment, the <br />Expanded Project and the Second Encroachment Permit. <br />IN WITNESS WHEREOF, the parties hereto have executed this Amendment as of the <br />date first written above. <br />
The URL can be used to link to this page
Your browser does not support the video tag.