My WebLink
|
Help
|
About
|
Sign Out
CURRIN - REIMBURSEMENT AGMT - TREE FARM SANITARY SEWER PUMP STATION
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
C
>
CURRIN - REIMBURSEMENT AGMT - TREE FARM SANITARY SEWER PUMP STATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2008 4:42:33 PM
Creation date
10/18/2007 10:44:35 AM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
4/30/1996
LONG TERM AGREEMENTS - NAME
CURRIN
LONG TERM AGREEMENTS - TYPE
REIMBURSEMENT AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />REIMBURSEMENT AGREEMENT FOR <br />INSPECTION SERVICES OF TREE FARM SANITARY SEWER PUMP STATION <br />THIS AGREEMENT is entered into at Pleasanton, California, this ~p day of ~J~i~1 L , <br />1996 by and between the CITY OF PLEASANTON, Alameda County, California, a municipal <br />corporation ("City") and William L. Currin and Betty J. Currin ("Developer") with reference to <br />the following facts. <br />A. Developer is the owner of certain real property in the City of Pleasanton, County <br />of Alameda, State of California, commonly known as Oak Tree Farm, Tract 6563, (the <br />"Property"). Developer has obtained City approval of a final map for an 25 unit single-family <br />residential project to be constructed on the Property. <br />B. In connection with construction described above, Developer is required to <br />construct a water pump station and reservoir. <br />C. City desires to contract directly with G.S. Dodson and Associates for inspection <br />services, shop drawing review, and related documents for Oak Tree Farm sanitary sewer pump <br />station, and related telemetry. <br />NOW, THEREFORE, IT IS AGREED AS FOLLOWS: <br />1. Work Developer is constructing the Oak Tree Farm sanitary sewer pump station, <br />and related telemetry per plans and specifications approved by the City Engineer. As part of the <br />construction, City desires to contract directly with its consultants to complete shop drawing <br />review, assist in change orders, and periodic inspection. <br />2. Reimbursement. Developers agree to reimburse City for all costs for all work <br />described in Paragraph 1 above. No overhead shall be charged . by the City. Developer shall <br />make payment to the City within thirty (30) days after the receipt of invoices from City. If <br />payment is not received, all work may be suspended until compensation is received. <br />3. Amount. Developers shall pay the City a total amount not to exceed <br />$19,947.00 for the work described in Paragraph 1. <br />4. .Term. This agreement shall remain in effect until such time as the Oak Tree Farm <br />sanitary sewer pump station, and related telemetry is completed and accepted by the City. <br />5. Compliance with Laws. The Developer shall comply with all applicable federal, <br />state, and municipal laws, rules, and ordinances. No discrimination shall be made by the <br />Developer in the employment of persons to work under this contract because of race, color, <br />national origin, ancestry, sex or religion of such person. <br />
The URL can be used to link to this page
Your browser does not support the video tag.