Laserfiche WebLink
Project <br />Description <br />Estimated Costs <br />Presley Property (Gold <br />Creek) Open Space (30.9 <br />acres) <br />This project involves improving the City-owned Presley <br />Fw perty into a functional and usable open space area. <br />Planned improvements could include pedestrian trails, <br />picnic areas, camping grounds, rest rooms, parking, and <br />other related amenities. The exact type and mix of uses for <br />this site will be determined through a Park Master Plan <br />process, which is managed by staff and the Packs and <br />Recreation Commission. <br />$650,000 (PFF) <br />Sports Park: Renovation of <br />Irrigation System <br />This project will replace numerous turf spray heads that are <br />nearly 30 years old. <br />$17,000 <br />Sports Park: Renovation of <br />Rest Room/ Concession <br />Stand No. 3 <br />Renovate or replace existing metal rest room (#3) and <br />concession building. <br />$125,000 <br />Sports Park: Replacement of <br />the Backstop and Fencing at <br />the Softball Complex <br />Current backstops are too small for proposed new fast pitch <br />program and tournaments; outfield and side fencing <br />replacement necessary for safety of spectators and parked <br />vehicles. <br />$150,000 <br />Staples Ranch Community <br />Park (33 acres) <br />Design and construction of 33 acres of community park <br />space on the Staples Ranch property in North East <br />Pleasanton. The ultimate size and amenities of this site are <br />still in the negotiations phase. Staff anticipates that these <br />negotiations, and the Parks Master Plan process, will result <br />in a project that is better than what could otherwise be <br />funded through the City's capital fee program. <br />$2,500,000 <br />(PFF) <br />Sutter Gate Park Park <br />Development (Phase II) <br />Phase II of the Sutter Gate Park Project will develop <br />approximately 3-1/2 acres of expanded park area consisting <br />of 1 acre of the Arroyo Macho and 2 -12 acres of land <br />laying east of the original park. <br />$202,500 <br />Woodthmsh Park: <br />Renovation <br />Renovate 3.5 acre Woodthrush Neighborhood Park. <br />Renovation includes regrading of turf, upgrading irrigation <br />system, turf replacement, additional trees and shrubs, and <br />new park furniture. <br />$105,000 <br />LISTING OF UNFUNDED PROJECTS <br />PARKS PROJECTS <br />FY 2000 012003 -04 <br />96 REVISED clp unfunded projects.xIs <br />s/16/2000 <br />rma <br />