My WebLink
|
Help
|
About
|
Sign Out
RES 00071A
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2000
>
RES 00071A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2009 3:05:34 PM
Creation date
6/12/2000 9:28:42 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/6/2000
DOCUMENT NO
RES 00071A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project <br />Description <br />Estimated Costs <br />Facility Related Parks Protects <br />Amador Valley Community <br />Park: Expansion and <br />Renovation of the Cultural <br />Arts Building <br />Add 1,500 square feet 10 the Cultural Arts Building for <br />expanded activity classes, etc; renovate bathrooms and patio <br />area, and make interior modifications. This project will be <br />reviewed as part of the Amador Park Master Plan. <br />$445,000 <br />Amador Valley Community <br />Park: Park and Facility <br />Renovations <br />Renovate 17 acres of Amador Valley Community Park <br />including improved drainage, upgrade irrigation system, <br />renovate turf areas, additional trees/shrubs, and new park <br />furniture. This project will be reviewed as part of the <br />Amador Park Master Plan. <br />5340,000 <br />Amador Valley Community <br />Park: Renovation of the <br />Recreation Center <br />Renovate the Amador Park Recreation Center by providing <br />a new roof, enlarging the bathrooms and entries to meet <br />ADA standards, upgrading the lighting to current standards, <br />and interior improvements. This project will be reviewed as <br />nart of the Amador Park Master Plan. <br />$330,000 <br />Amador Valley Community <br />Park: Expansion of <br />Gingerbread Preschool <br />This project includes design and construction costs related <br />to expanding the preschool facility, off Black Avenue, by <br />2,000 square feet to accommodate future enrollment <br />projections. This project will be reviewed as part of the <br />Amador Park Master Plan. <br />$400,000 (PFF) <br />Community Trails System <br />(includes Arroyos) <br />This project involves the acquisition and development of a <br />multi-use trail/route system to serve the recreational needs <br />of the community for non motorized travel (pedestrian, <br />bicycle, equestrian and wheelchair users). The trail system <br />would serve the existing developed portions of the City as <br />well as undeveloped areas adjacent to the City's boundary. <br />$6,000,000 <br />(PFF) <br />Kaiser Sand and Gravel <br />Community Park (38 acres) <br />Design and construction of 38 acres of community park <br />space in the general vicinity of the Kaiser Sand and Gravel <br />property. Proposed amenities could include lighted sports <br />fields; basketball courts; pedestrian trails; picnic areas; rest <br />rooms; parking; and other related amenities. The exact type <br />and mix of uses for this site will be determined through a <br />Park Master Plan process, which is managed by staff and <br />the Parks and Recreation Commission. <br />$4,750,000 <br />(PFF) <br />Miscellaneous: New Signage <br />for Various Pinks <br />This project will provide for the replacement of existing <br />park signs with standard, precast concrete at all park sites. <br />$25,000 <br />Miscellaneous: Park Tree <br />Interplanting <br />This project will provide for the interplanting of trees in <br />existing parks with mature trees. <br />$15,000 <br />Pleasanton Upper Field: <br />Construction of a <br />Concession/Rest Room <br />Building <br />No permanent rest rooms or concessions currently exist at <br />this site. Would replace old wooden structure currently <br />utilized by sports groups. <br />$100,000 <br />Pleasanton Upper Field: <br />Phase II Improvements, <br />This project will provide a loop concrete pathway, <br />additional parking at the west end of the park and provide <br />for landscaping around the existing play areas. <br />5155,000 <br />r <br />r <br />LISTING OF UNFUNDED PROJECTS <br />PARKS PROJECTS <br />FY 2000-01/2003-04 <br />95 <br />REVISED cip unfunded projecls.xlr <br />5/I8rz000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.