My WebLink
|
Help
|
About
|
Sign Out
RES 00071A
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2000
>
RES 00071A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2009 3:05:34 PM
Creation date
6/12/2000 9:28:42 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/6/2000
DOCUMENT NO
RES 00071A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project <br />Description <br />Estimated Costs <br />Bernal Avenue Construction <br />Bernal Avenue at Arroyo de <br />la Laguna: (Rehabilitate old <br />bridge) <br />This bridge needs to be rehabilitated due to age and failure <br />to meet current bridge standards. <br />$1,000,000 <br />Bernal Avenue: Interchange <br />Ramp Improvements <br />This project includes adding a second northbound on -ramp <br />lane and a second southbound off -ramp lane. It also <br />includes widening the northbound off-ramp together with <br />signalization on both ramp intersections. Work includes <br />additional bridge widening and work on the main line 1-680 <br />to accommodate the extra lanes. It is anticipated that the <br />loop ramp will have to be relocated to the NW quadrant of <br />the interchange <br />514,000,000 <br />Bernal Court: Reconstruction <br />of Roadway <br />Complete roadway improvements by adding parking, curb, <br />gutter and sidewalk on north side of Bernal Court west of <br />Harrison Street including replacing sewer main and laterals <br />and water services. <br />$44,000 <br />Busch Road <br />Busch Road: Roadway <br />Improvements at Valley <br />Provide an additional lane for westbound traffic on Busch <br />Road to provide a right tun/left turn lane to Valley Avenue. <br />Was listed as an unfunded project in FY 1994/95 program. <br />$86,000 <br />Busch Road: Roadway <br />Improvements at the <br />Operations Service Center <br />Widening plus curb, gutter, sidewalk, lighting, and <br />landscaping OSC frontage. <br />$630,000 <br />Busch Road: Roadway <br />Widening from Valley Ave to <br />El Charro <br />This project would widen Busch Road to four lanes with <br />curb, gutter, and sidewalk and auxiliary lanes as required. <br />$4,716,000 <br />Canyon Road <br />Canyon Road: Roadway <br />Widening from Foothill Road <br />to Stoneridge Mall Road <br />Cost would be direct developer as the traffic impacts are <br />locally generated and the benefits are direct. <br />S410,000 <br />Del Valle Parkway <br />Del Valle Parkway. <br />Extension of First Street to <br />Bernal Avenue <br />Project would complete the roadway from First Street to <br />Bernal Ave as a three-lane road with bikeway. <br />$375,000 <br />Del Vane Parkway: <br />Extension of Right -of -Way <br />Obtain street right -of -way for approved street alignment and <br />Del Valle Parkway Extension construction project. <br />$250,000 <br />El Charro Road <br />El Charro Road: 1-580 to <br />Stanley Blvd <br />The roadway would be six lanes from 1 to Stoneridge <br />Drive and four lanes from Stoneridge to Stanley. <br />$13,500,000 <br />El Charro Road: Interchange <br />improvements at 1 -580 <br />Add second freeway bridge and widen off-ramps, provide <br />traffic signals. <br />$4,800,000 <br />Foetid l Road <br />Foothill Road: <br />Reconfiguration and Signal at <br />1 -580 Interchange <br />The current interchange is a Poll cloverleaf design. High <br />volumes necessitate a conversion to partial cloverleaf to <br />improve safety and capacity. <br />52,000,000 <br />LISTING OF UNFUNDED PROJECTS <br />STREETS PROJECTS <br />FY 2000-01/2003-04 <br />101 <br />REVISED cip unfunded projects.xls <br />3/18/2000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.