My WebLink
|
Help
|
About
|
Sign Out
RES 00071A
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2000
>
RES 00071A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2009 3:05:34 PM
Creation date
6/12/2000 9:28:42 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/6/2000
DOCUMENT NO
RES 00071A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project <br />Description <br />Estimated Costs <br />Foothill Road: Roadway <br />Widening from Bemal to <br />Longview Drive <br />Complete construction oftbree lane section with bike and <br />pedestrian facilities. Current cross section is two lanes with <br />no pedestrian and bike provisions. <br />$300,000 <br />Foothill Road: Roadway <br />Widening from Raccoon <br />Hollow Court to Highland <br />Oaks Drive <br />Widen Foothill Road to its ultimate width as designated in <br />the General Plan. Road construction will follow City <br />Council approval of an alignment design. <br />$1,000,000 <br />Hopyard Road Widening <br />Hopyard Road: Roadway <br />Widening Black Avenue <br />Del Valle Parkway, Phase 11 <br />Construct two additional travel lanes from Black Avenue to <br />Del Valle Parkway, with curb, gutter, sidewalk, median with <br />landscaping, and undergrounding of overhead electric and <br />telephone lines. <br />$2,006,600 <br />Hopyard Road: Roadway <br />Widening from Valley to <br />Black, Phase I <br />Construct two additional travel lanes from Valley to Black, <br />curb, gutter, sidewalk, and median with landscaping, and <br />underground overhead electric and telephone lines. <br />$1,058,400 <br />Kamp Drive <br />Kamp Drive/ Martin Avenue: <br />Storm Drain Improvements <br />Installation of storm drain systems from Busch Road along <br />the future portion of Kamp Drive and Martin Avenue to <br />provide drainage to the area between Busch Road and <br />Trenery Drive. <br />$710,000 <br />Mans Shed <br />Main Street: Downtown <br />Beautification Improvements <br />Complete several specific beautification enhancements for <br />Main Street including the Arroyo Del Valle Bridge <br />decorative enhancements, installation of an entry structure <br />at the south end of Main Street, and installation of fencing <br />and street lighting around the edge of Civic Park and <br />modification of the support posts of the Pleasanton sign to <br />create kiosks which were recommended by the downtown <br />task force. <br />$755,000 <br />Martin Avenue <br />Martin Avenue: Pedestrian <br />Bridge at Arroyo Mocho <br />This project would connect the residential area north of the <br />Arroyo Mocho to the school on the south side. <br />$300,000 <br />Old Bernal Avenue <br />Old Bemal Avenue: <br />Roadway Improvements at <br />Bernal Avenue <br />Add a new southbound right turn lane from Old Bernal to <br />westbound Bemal Avenue to reduce projected overcapacity <br />problems. <br />$63,000 <br />OW Stanley Boulevard <br />Old Stanley Blvd: <br />Reconstruction of Roadway <br />and Utility Undergrounding <br />Reconstruct Old Stanley Boulevard from Santa Rita Road to <br />Stanley Boulevard including new pavement, sidewalk and <br />curb and gutter. Also, underground 1500 L.F. of existing <br />overhead electrical telephone and cable lines to improve <br />aesthetics of area and reduce utility problems. <br />$1,360,000 <br />LISTING OF UNFUNDED PROJECTS <br />STREETS PROJECTS <br />FY 2000-01/2003-04 <br />102 <br />REVISED cip unfunded pmjects.xls <br />5/18,2000 <br />IVA <br />
The URL can be used to link to this page
Your browser does not support the video tag.