Laserfiche WebLink
Project <br />Description <br />Estimated Costs <br />TRAILS RELATED STREETS PROJECTS: <br />Arroyo de la Laguna <br />Pleasanton Canal to Arroyo <br />del Valle: Trail Paving <br />This project would provide paving and drainage for the <br />portion of the Arroyo de La Laguna Trail from the <br />Pleasanton Bridge south to the intersection with Arroyo Del <br />Valle. <br />$121,500 <br />Bikeways, Other <br />This project would complete other portions of trails within <br />the Pleasanton Plan which are on arterial streets. Other <br />portions which are not on public right -of -way would be <br />funded within the Capital Facilities plan. <br />$200,000 <br />TRAFFIC SIGNALS: <br />Traffic Signals at Various <br />Locations (Direct <br />Development Cost) <br />Install a new traffic signal as planned in the General Plan: <br />Foothill Blvd Muirwood Dr (South), <br />Vineyard Ave Ruby Hill, <br />Hopyard ltd Del Valle Pkwy, <br />Valley Ave Hansen Dr, <br />Kemal Ave Main St, <br />Bemal Ave Pleasanton Ave, <br />Bernal Ave Kottinger Dr, <br />Bernal Ave Del Valle Pkwy, <br />Valley Ave Rose Ave, <br />Valley Ave Paseo Santa Cruz (North), <br />West Las Positas Bl Donnan Rd, <br />West Las Positas Blvd Payne Rd, <br />Old Santa Rita Rd A Rosewood Dr. <br />S 120,000 each <br />LISTING OF UNFUNDED PROJECTS <br />STREETS PROJECTS <br />FY 2000- 012003 -04 <br />104 <br />REVISED cip unfunded projects.als <br />5/18/2000 <br />