My WebLink
|
Help
|
About
|
Sign Out
RES 00071A
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2000
>
RES 00071A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2009 3:05:34 PM
Creation date
6/12/2000 9:28:42 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/6/2000
DOCUMENT NO
RES 00071A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project <br />Description <br />Estimated Costs <br />Railroad Street <br />Railroad Street: Roadway <br />Extension from Spring to <br />Ray Street <br />Extension of Railroad Street from Spring to Ray Street to <br />improve traffic circulation. <br />$2,170,000 <br />Ray Street <br />Rose Avenue <br />Rose Avenue: Roadway <br />Extension to Valley Avenue <br />Extend Rose Avenue westerly from its current termination <br />to Valley Avenue. This would be a three -lane collector <br />$935,000 <br />Stoneridge Drive <br />Stoneridge Drive: Construct a <br />Second Lane on -ramp at I- <br />680 <br />Provides second lane for northbound on -ramp and necessary <br />freeway revisions to accommodate weaving movements <br />(NB 1 -680 to EB 1-580). <br />$49,000,000 <br />Stoneridge Drive: Roadway <br />Widening from Newton to El <br />Charm <br />Provides four lane with median, sidewalks where no road <br />exists. <br />51,500,000 <br />Stoneridge Drive: Roadway <br />Widening from Santa Rita to <br />El Charro <br />Provides third lane each direction to sweet. <br />$1,500,000 <br />Stoneridge Mall Road <br />Stoneridge Mall Road: <br />Sidewalk Construction <br />Construct a sidewalk on the west side of Stoneridge Mall <br />Road between Canyon Way and Laurel Creek Way to <br />provide pedestrian access to Stoneridge Mall. <br />$100,000 <br />Sono( Boulevard <br />Sunol Blvd Improvements: <br />junipero Road to Sycamore <br />Reconstruction of existing roadway damaged by truck <br />traffic including widening from two to four lanes, including <br />bicycle lanes, signal interconnect and conduit crossing for <br />future signals at three intersections. <br />$1,000,000 <br />Sunol Blvd: Interchange <br />widening and Traffic Signals <br />at 1 -680 <br />Widen on and off -ramps to accommodate projected traffic. <br />(North bound off ramp and traffic signal) <br />$850,000 <br />Sycamore Road <br />Sycamore Road: Construct <br />Bypass Road for Golf Course <br />Provide new collector roadway to serve golf course and <br />residential development. <br />$2,000,000 <br />Valley Avenue <br />Valley Avenue: Collector <br />Lanes at Bernal Avenue to <br />Junipero (S.F. Water) <br />Construct three and four lane collector arterial to serve new <br />S. F. Bernal development <br />$6,000,000 <br />Vineyard <br />Vineyard Corridor Street: <br />Relocation of Roadway <br />Relocate Vineyard Avenue East of the "S" curve from its <br />present location to a location adjacent to the Arroyo. <br />S2,000,000 <br />W. Las Positas <br />W. Las Positas: 1-680 <br />Interchange or Alternatives <br />Construct a full interchange with four lane bridge over I <br />680 or alternative improvements as deternined by current <br />studies underway. <br />$16,240,000 <br />W. Las Positas: Roadway <br />Widening at Foothill Rd to <br />Muirwood Drive <br />This project would widen the existing 20' wide lane to two <br />lanes and provide permanent curb gutter and sidewalks. <br />$250,000 <br />r <br />LISTING OF UNFUNDED PROJECTS <br />STREETS PROJECTS <br />FY 2000-01/2003-04 <br />103 <br />REVISED cip unfunded projects.xh <br />5/182000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.