Laserfiche WebLink
Downtown Specific Plan Committee and reinforced its recommendation for the <br />development of additional facility space including a center for the performing arts, art <br />galleries and class space. <br />Staff Comment: Downtown Specific Plan Committee is currently reviewing a number <br />of alternatives for the downtown area. At this time, staff anticipates providing the <br />Council with a listing of Committee recommendations in October of this year. The <br />Capital Improvement Program does not include facilities earmarked for our activities. <br />However, the CIP does include a reserve for a City Community Center and a master <br />plan of Amador Park which may result in space for art activities. <br />Planning Commission Approved all projects as presented in the CIP with the <br />following recommendations for the future consideration: <br />Install on- street parking on Owens Drive near the BART station to accommodate <br />demand for BART parking. <br />Staff Comment: The proposal to allow parking on Owens Drive in the vicinity of <br />the BART Station is not practical due to a number of factors. The need to have the <br />full street available for traffic movement is the primary concern. Providing for <br />parking along Owens Drive would require the removal of a travel lane. The streets <br />within the Hacienda Business Park were not designed with on- street parking in <br />mind. The driveways and bus turnout bays along Owens Drive need clear sight <br />distance for usage, as do the turning lanes into BART and PeopleSoft. The <br />relatively high speed of traffic on Owens Drive also makes parking and opening <br />doors problematic. On -street parking would also encourage packers to walk across <br />Owens Drive from their cars parked on the south side of the street rather than walk <br />to the traffic signals. This jaywalking would not be safe. <br />Recently, a temporary parking lot has been constructed on the west side of the <br />existing BART parking lot in Dublin. The lot has recently been paved and will <br />soon be open. Some 400 additional parking spaces have been provided. Staff <br />believes that in the short-term the additional 400 spaces will help mitigate the <br />current parking shortage. <br />Review potential for bike lanes throughout Hacienda Business Park. <br />Staff Comment: Currently bike lanes are provided along the north side of W. Las <br />Positas Blvd. between Stoneridge Drive and Hopyard Road; on the south side of <br />Stoneridge Drive between Hopyard Road and W. Las Positas; and on the south side <br />of Owens Drive where the Iron Horse Trail has been routed along a ten foot walk <br />between the BART Station and Tassajara Creek. Public Works will request that <br />the City's Bicycle Advisory Committee review the options for additional bike trail <br />routes through Hacienda Business Park (including the potential use of Chabot <br />Canal) and make recommendations. <br />61 <br />