Laserfiche WebLink
the willow and cottonwood trees in the Eastern Area, <br />trees located around the former farmhouse in the Western Area, <br />walnut trees along the southern frontage of Bernal Avenue and <br />sycamores within the median (these trees will be replaced with <br />new plantings as par[ of the Bernal Avenue landscaping plan), <br />and <br />:~nttered iree~ in tltc Central ,1rea within the Pha~c 1 drecloninCnl <br />;irate. <br />3.3 Only remove [he minimum number of sycamore trees from the median <br />and the northern and southern frontage of Berna] Avenue as necessary to <br />accommodate platmed access into and from the Planning Area as <br />indicated on the Phase I Circuiation Policy Diagram: Figure 4-1. <br />FLOOD CONTROL MANAGEMENT OBJECTIVE <br />TO PROTECT PEOPLE AND PROPERTY FROM FLOOD HAZARDS. <br />Flood Control Policy 1: Potential Regional Flood Control Strategies. <br />Accommodate reasonably practicable regional flood control strategies for Arroyo <br />de ]a Laguna into the Phase I land use program, consistent with policies for <br />protection of riparian corridors. <br />GUIDELINES: <br />1.1 Provide a setback along Arroyo de ]a Laguna to allow Zone 7 or other <br />public agencies [o implement a range of regional flood control <br />improvements outside of the Phase I developed portions of the site. <br />1.2 Any in-channel improvements constructed by Zone 7 or any other public <br />agency as necessary to implement a flood control plan shall conserve as <br />much of [he existing riparian habitat as possible and shall restore riparian <br />vegetation in x manner conducive to long-term enhancement of the <br />corridor after any grading for flood capacity improvements. <br />To the extent feasible, any widening of [he arroyo should occur <br />on [he eastern side of the channel, retaining [he riparian <br />vegetation on the western side. There may be portions of the <br />6-6 <br />