Laserfiche WebLink
western side of the arroyo where widening improvements are also <br />necessary to accommodate flood flaws or stabilize channel banks. <br />Designs for any channel improvements shall include restoration <br />and enhancement of riparian vegetation along the bottom and <br />banks of the channel following construction. <br />Flood Control Policy 2: On-Site Detention. Retain on-site any increase in <br />peak storm water runoff resulting from development under the 100-year storm <br />event. <br />GUIDELINES: <br />2.1 In developing Phase I, incorporate storm water detention basins into the <br />_ Phase II portion of the site, capable of retaining increases in post- <br />development peak runoff from the site resulting from a 100-year storm <br />event. <br />2.2 Coordinate with Zone 7 on storm water release patterns to meet regional <br />flood control objectives. <br />Flood Control Policy 3: On-Site Flood Protection. Protect on-site <br />development against flood hazards by allowing habitable buildings only in <br />locations and at elevations outside the 100-year flood plain. <br />GUIDELINES: <br />3.1 If regional flood control improvements are not assured for the Arroyo de <br />la Laguna prior [o implementation of the Phase I grading plan for the <br />Western Area, allow protection of on-site development in the Western <br />Area by either raising residential pad elevations and/or constructing a <br />berm/levee along the western edge of Parcels 1 and 2. Such measures <br />may provide protection against flood flows of at least the then-best. <br />estimate of future 100-year flood flow , -',` -- '-; <br />[Current FEMA flood maps show that the 100 year flood even[ of <br />17,000 cfs through the Planning Area would be contained within <br />existing banks of the channel of the Arroyo de la Laguna. <br />Estimates for fumre flood flows range from 17,000 cfs to 27,000 <br />cfs. Zone 7 is currently re-evaluating &x+~iis flood flow <br />6-7 <br />