Laserfiche WebLink
1.4 ~~Hncouraee I~_irine of new residences to take advantage of home- <br />based work opportunities. <br />1.5 Follow Green Building demolition and construction practices, as <br />feasible, to reduce volatile organics and other pollutants on-site and to <br />reduce emissions region wide created in producing energy. <br />Air Quality Policy 2: Dust Control. Comply wills Best Management Practices <br />to control construction-related dust emissions during all phases of construction. <br />CLII.TLJRAL RESOURCES OBJECTIVE: <br />TO PROTECT AND PRESERVE CULTURAL RESOURCES. <br />Cultural Resource Policy 1: Protection of Known Resources. Known <br />cultural resources shall be protected by avoidance or "capping", or if known <br />sites cannot be avoided or capped consistent with development of the Phase I <br />land development plan, prepare and implement a Resources Recovery Plan prior <br />to dismrbing the site. <br />[ There are two known cultural resource sites designated by the State of <br />California within the Planning Area. Avoidance of these sites may be <br />achieved by retaining [hem as open space with no dismrbance or as land <br />uses requiring minimal disturbance of the sub-surface resources for site <br />preparation. "Capping" may include the addition of soil and/or paving <br />prior m site development such that no dismrbance of underlying soils <br />occurs.] <br />GUIDELINES: <br />L1 Prior to approval of a final grading plan, complete ar.-:rR-;-.,~~culmral <br />resource survey to identify [hc extent and depth of known cultural <br />resource sites. <br />1.2 Protection of cultural resources near [he Bernal bridge shall be achieved <br />in the Phase II land use plan through avoidance, limiting sub-surface <br />disturbance for park development, and if necessary, preparing and <br />implementing a Resources Recovery Plan prior to disturbing the site. <br />6-9 <br />