My WebLink
|
Help
|
About
|
Sign Out
RES 00111A
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2000
>
RES 00111A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2008 11:32:27 AM
Creation date
9/11/2000 9:56:09 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/21/2000
DOCUMENT NO
RES 00111
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.3 Protection of known culmral resources in the southeast quadrant of the I- <br />6S0/Bernal interchange should be accomplished via "capping" of the <br />cotrmtercial/office center parking lot, or preparing and implementing a <br />Resources Recovery Plan prior to disturbing the site. <br />1.4 If disturbance of culmral resources cannot be avoided, a Resources <br />Recovery Plan shall be developed and implemented. <br />Cultural Resource Policy 2: Minimize Risks to Potentially Undiscovered <br />Resources. Minimize the risk of adverse impacts to potential cultural resources <br />that may exist on [he site and that may be discovered in the future. <br />CGUIDELINES: <br />2.1 A culmral resources survey of the entire site shall be completed prior to <br />approval of any grading. <br />2.2 A qualified archaeologist shall monitor grading activities at locations <br />where cultural resources are currently known to exist, and where culmral <br />resources may be discovered during future surveys. <br />2.3 If culmral or archaeological resources are discovered during grading or <br />site preparation, all work in that area shall stop until an archaeologist has <br />recommended, and the City has approved, activities to protect and/or <br />recover the identified culmral resources. <br />HAZARDOUS MATERIALS OBJECTIVE: <br />TO PROTECT CONSTRUCTION WORKERS AND FUTURE RESIDENTS/SITE USERS FROM <br />HAZARDOUS MATERIALS THAT MAY BE ON THE SITE AND THAT POSE AN UNACCEPTABLE <br />RISK. <br />Hazardous Materials Policy 1: '' •-' • °' •-~ --• - <br />~, <br />,;;-s,-reaHsizaruous ;\latcriai~ titndies. If necessary and required by <br />findings of a-Rprehmmary ts,~ie:~,-e+;,~art ,4,~:~e~_;a;t,:.~h_irtvduus mulcri;d, <br />,:u,ii_., subsequent field investigations and remediation plans shall be prepared <br />and implemented prior to any on-site construction activity. <br />6-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.