Laserfiche WebLink
"~"~" ~''' "' - ~ .. .. - hauu~ou~ m;urrials smdia~ to establish the <br />extent and character of potential existing contamination within the Planning Area, <br />- including radionuclides, <br />site-specific soils, geologic, and/or geo[echnical engineering studies, <br />a cultural resources survey of the entire Planning Area, and <br />acoustical studies for Phase I residential areas exposed [o exterior noise levels <br />exceeding 65 dB Idn. <br />Parcel-Specific Tentative/Final Maps and Building Plans <br />Following approval of asite-specific PUD development plan, tentative and final maps will be <br />- required for most projects. These include detailed engineering improvement plans, including <br />grading plans, final landscaping plans, and other final plans necessary [o construct the project. <br />Building permit plans include final building architecture and sttve[ural requirements. At each <br />- of these steps, City review will etuure the final project as constructed will achieve the <br />objectives of the Specific Plan. <br />73 <br />