My WebLink
|
Help
|
About
|
Sign Out
RES 00114A
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2000
>
RES 00114A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2008 11:33:51 AM
Creation date
9/11/2000 11:07:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/21/2000
DOCUMENT NO
RES 00114A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigation Monitoring and Reporting Program <br />BIOLOGY <br />O. Biology <br />Page 108 <br />Mitigation Measure: Ola. Require that the specific plan provide setbacW of at least 100 <br />feet from the existing centerline of the Arroyo de la Laguna or <br />at least 10 feet from the outermost drip line of existing trees <br />along the maiu channel of the Arroyo, whichever is greater. <br />Impact to be Mitigated: Potential for adverse effects on the riparian habitat of the Arroyo de la <br />Laguna. <br />AgencyHndividual <br />Responsible for <br />Implementation: City of Pleasanton, through site developer <br />Implementation Timing: Prior to approval of all development plans on the West Parcel <br />Mitigation Specifications: The setback requirement is intended to protect habitat vegetation. There- <br />fore, encroachment into the vegetated zone along the main channel is to <br />be avoided wherever possible. <br />1'he August, 2000 Specific Plan provides a setback from the main channel <br />of the Arroyo de la Laguna of approximately 300 fee[ from the [op of the <br />eastern bank as part of [he Phase I development. This design means [ha[ <br />no encroachment into the vegetated zone of the Arrnyo would occur as <br />part of Phase I. <br />Agency/Individual <br />Responsible for <br />Monitoring: City of Pleasanton, Planning Department <br />Action by Monitor: Verify [ha[ no grading or development is located within the Arroyo corri- <br />dor as defined in the mitigation measure. <br />Monitoring Timing: Prior to approval of the Specific Plan <br />Monitor: Completion Date: Signature: <br />
The URL can be used to link to this page
Your browser does not support the video tag.