My WebLink
|
Help
|
About
|
Sign Out
RES 00114A
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2000
>
RES 00114A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2008 11:33:51 AM
Creation date
9/11/2000 11:07:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/21/2000
DOCUMENT NO
RES 00114A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigation Monitoring and Reporting Program <br />BIOLOGY <br />O. Biology <br />Page 109 <br />Mitgatiou Measure: 016. Require consultation with California Department of Fish and <br />Game io any areas subject to their jurisdiction prior to any pro- <br />posed encroachment into the designated corridor, and con- <br />sultation with the U.S. Army Corps of Engineers prior to any <br />activity that would occur within the banks of the Arroyo chan- <br />nel <br />Impact to be Mitigated: Potential for adverse effects on [he riparian habitat of the Arroyo de la <br /> Laguna. <br />Agency/Individual <br />Responsible for <br />"~ implementation: City of Pleasanton, through site developer <br />Implementation Timing: Prior to issuance of a grading permit <br />Mitigation Specifications: Consult with, and obtain any necessary permits from appropriate <br /> environmental permitting agencies as required by PUD Conditions 71 to <br /> 74. <br />Agency/Individual <br />- Responsible for <br />Monitoring: City of Pleasanton, Planning Department <br />- Action by Monitor. (1) Review record (if any) of coordination between site developer and <br /> California Department of Fish and Game (DFG) and between site <br /> developer and U.S. Army Corps of Engineers (Corps) <br />-- (2) Verify that grading and development plans incorporate requirements <br /> imposed by DFG or the Corps (if any) <br />.- Monitoring Timing: (i) and (2) Prior [o approval of a grading plan for the West Parcel, prior <br /> to approval of any subsequent development plan or issumtce of any <br /> grading permit or development permit. <br />Monitor: Completion Date: Signature: <br />
The URL can be used to link to this page
Your browser does not support the video tag.