My WebLink
|
Help
|
About
|
Sign Out
RES 00114A
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2000
>
RES 00114A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2008 11:33:51 AM
Creation date
9/11/2000 11:07:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/21/2000
DOCUMENT NO
RES 00114A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigation Monitoring and Reporting Program L. Noise <br />Page 77 <br />NOISE <br />Mitigatioa Measure: Lla(1) and (2). Applying the standard for a Lda not in excess oj60 dB: <br />Increase the height or shift the location of the proposed <br />berm/soundwall combinations. <br />Impact to be Mitigated: Proposed residential development on [he West Parcel north of the I-680 <br /> overcrossing of [he Pleasanton Avenue extension would be exposed to a <br /> Ldn of greater than 60 dB. <br />AgencyQadividual <br />Responsible for <br />ImplemeatatioD: Site developer <br />Implemeatatioo Timing: Prior to occupancy of [he first homes on [he West Pazcel north of the <br /> I-680 overcrossing of the Pleasanton Avenue extension <br />Mitigation Specifications: The Specific Plan proposes a soundwall ranging in height from 16 to 18 <br /> feet along the west side of the southbound onmmp. This wall would end <br /> at Bernal Avenue (it would not extend westward along Bernal Avenue). <br /> A soundberm 16 feet high would be constructed along I-680, adjacent [o <br /> [he freeway right-of--way. <br />Ageacy/fodividual <br />Responsible for <br />Monitoring: City ofPleasantou, Planning Department <br />Action by Mmitor: (1) Verify that noise mitigation features specified in the Specific Plan <br /> are included in the final development plans. <br /> (2) Verify that noise mitigation features are built as specified. <br />Monitoring Timing: (1) Prior to approval of final development plans <br /> (2) Prior to issuance of first certificate of occupancy for residential use <br /> on the Wes[ Parccl north of [he I-680 overcrossing <br />NOTE: IMPLEMENTATION OF THIS MEASURE CONSISTENT WITH THE AUGUST, 2000 <br />SPECIFIC PLAN W/LL NOT MITIGATE THIS IMPACT TO A LESS-THAN- <br />SIGNIFICANT LEVEL 7NALL LOCATIONS. <br />Monitor: Completion Date: Signature: <br />
The URL can be used to link to this page
Your browser does not support the video tag.