Laserfiche WebLink
Mitigation Monitoring and Reporting Program L. Noise <br />Page 78 <br />NOISE <br />Mitigatioo Measure: Lla(3). /jmitigations that would reduce exterior noise (eve(s m campy <br />whh the adopted standard (ti0 dBJ carcnot jeasibfy be implo- <br />mented: Require detailed project-specific noise studies for <br />each development project in ea area where the standard is <br />exceeded to characterize noise conditions and to ideality the <br />noise reduction features that muss be incorporated to <br />achieve acceptable interior noise levels, and require incorpo- <br />ratios of those features into construction. <br />Specifications ojthis measure also app/y to Mitigation Measures Llc(3) and Lld(3J <br />Impact to be Mitigated: Proposed residential developmcn[ on the West Parcel north of the I-680 <br /> overcrossing of the Pleasanton Avenue extension would be exposed to a <br /> Ldn of greater than 60 dB. <br />AgencyJlndividual <br />Responsible for Developers of residential projects on the Wesl Parcel north of the I-680 <br />Implemen[atioo: overcrossing of the Pleasanton Avenue extension <br />Implementation Timing: Prior to construction <br />Mitigatioo Specifications: To achieve exterior noise levels of 60 dB along I-680, the combination <br /> berm/wall along [he freeway would have to be increased to a height of <br /> more than 30 fee[.. At the Bernal/I-680 interchange, [he height of the <br /> soundwall would have to be increased [0 30+ feet [o achieve noise levels <br /> of 60 dB or less. Because provision of sound barriers of these heights is <br /> not possible, this mitigation measure is required. <br /> Construction specifications must demonstrate [ha[ interior noise levels <br /> will be reduced to no more than 45 dBA Ldn. <br />AgencyQndividual <br />Responsible [or <br />Monitoring: CiTy of Pleasanton, Building Department <br />Action by Monitor: (]) Verify that noise mitigation features are incorporated in building <br /> specifications. <br /> (2) Verify that noise mitigation features are built as specified. <br />Monitoring Timing: (1) Prior to issuance of huilding permits. <br /> (2) Prior to issuance of certificates of occupancy. <br />Monitor: Completion Date: Signature: <br />