My WebLink
|
Help
|
About
|
Sign Out
ORD 1864
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1801 - 1900
>
ORD 1864
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:24:07 PM
Creation date
9/10/2002 3:00:18 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
8/20/2002
DOCUMENT NO
ORD 1864
DOCUMENT NAME
MOREIRA
NOTES
PUD-13
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
alarm system, including waterflow and valve tamper, shall have plans and <br />specifications submitted to Fire Prevention for review and approval prior to <br />installation. All required inspections and witnessing of tests shall be <br />completed prior to final inspection and occupancy of the building(s). The fire <br />alarm system shall be monitored in accordance with the Pleasanton Municipal <br />Ordinance #1778. The fire alarm system shall transmit zone information to a <br />UL listed Central Station as specified in the Ordinance. <br /> <br />48. The applicant shall keep the site free of fire hazards from the start of lumber <br /> construction until final inspection. <br /> <br />49. Prior to any framing construction, the applicant shall provide adequate fire <br /> protection facilities, including but not limited to surface roads and a water <br /> supply and water flow meeting Fire Department standards to suppress a major <br /> fire. If, prior to any framing construction, the applicant proposes in writing an <br /> alternate method of fire protection, the Fire Chief may allow the alternative <br /> method. <br /> <br />50. Unless otherwise approved by the Fire Marshall no housing construction shall <br /> begin until such time as an acceptable emergency vehicle access has been <br /> established, as defined by the Fire Marshall. This access shall be maintained at <br /> all time until the public improvements are accepted. <br /> <br />Engineering <br /> <br />51. The applicant shall submit a refundable cash bond for hazard and erosion <br /> control prior to issuance of an Engineering or Building Department permit. <br /> The amount of this bond will be determined by the City Engineer. <br /> <br />52. The project developer shall submit a final grading and drainage plan prepared <br /> by a licensed civil engineer depicting all final grades and on-site drainage <br /> control measures to protect all cut and fill slopes from surface water overflow. <br /> This plan shall be subject to the review and approval of the City Engineer <br /> and/or the Director of Building Inspection prior to the issuance of any building <br /> permits. <br /> <br />53. Except as otherwise approved by the City Engineer, all of the proposed access <br /> and service easements shall be increased in width to 20 ft. This modification <br /> shall be shown on the parcel map submitted for review and approval by the <br /> City. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.