Laserfiche WebLink
54. The applicant shall grant an easement to the City over those parcels needed for <br /> public service easements (P.S.E.) and which are approved by the City Engineer <br /> or other easements which may be designated by the City Engineer. <br /> <br />55. A maintenance agreement for all the private shared improvements shall be <br /> submitted to the City Attorney for review and approval prior to recordation of <br /> the parcel map. <br /> <br />56. The design for the line, grade, and structural sections for the driveway serving <br /> this development shall be subject to final review and approval by the City <br /> Engineer. <br /> <br />57. All existing wells on the site shall be removed or sealed, filled and abandoned <br /> pursuant to Alameda County Ord. 73-68, prior to the start of grading <br /> operations unless Zone 7 retains specific wells for observation wells, or special <br /> approval is obtained from the City Engineer for temporary use of an existing <br /> well for construction water or for irrigation purposes. Any wells designated <br /> for abandonment or any wells, encountered during construction, are to be <br /> destroyed in accordance with a permit obtained from Zone 7. Any existing <br /> well that is kept for irrigation purposes shall be disconnected from the City's <br /> water system and fitted with backflow devices to the satisfaction of the City <br /> Engineer. <br /> <br />58. All existing septic tanks or holding tanks shall be removed or sealed, filled, <br /> and abandoned, pursuant to the requirements of the Alameda County <br /> Department of Health Services. <br /> <br />59. The haul ronte for all materials to and from this development shall be approved <br /> by the City Engineer prior to the issuance of an encroachment permit. <br /> <br />60. The applicant shall include erosion control measures on the final grading plan, <br /> subject to the approval of the City Engineer. The applicant is responsible for <br /> ensuring that the contractor is aware of such measures. All cut and fill slopes <br /> shall be revegetated and stabilized as soon as possible after completion of <br /> grading, in no case later than October 15. No grading shall occur between <br /> October 15 and April 15 unless approved erosion control measures are in <br /> place, subject to the approval of the Building Department. Such measures shall <br /> be maintained until such time as permanent landscaping is in place. <br /> <br />61. The developer shall submit a dust control plan or procedure as part of the <br /> improvement plans. Such plan shall be subject to the approval of the City <br /> Engineer and shall specifically address dust reduction to neighboring <br /> properties. <br /> <br /> <br />