My WebLink
|
Help
|
About
|
Sign Out
ORD 1864
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1801 - 1900
>
ORD 1864
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:24:07 PM
Creation date
9/10/2002 3:00:18 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
8/20/2002
DOCUMENT NO
ORD 1864
DOCUMENT NAME
MOREIRA
NOTES
PUD-13
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
70. The applicant shall label all on-site storm drain inlets with the wording, "No <br /> Dumping -- Drains to Bay" using City-approved methods and materials. <br /> <br />71. The applicant shall design the on-site drainage system for the individual lots in <br /> such a manner that the storm-water runoff is filtered through a landscape area <br /> and then transported through a drain inlet to the storm drainage system in the <br /> adjacent public street. These specific details shall be submitted for review and <br /> approval of the City Engineer and Planning Director prior to approval of the <br /> final map. <br /> <br />72. The applicant shall include erosion control/storm water quality measures on the <br /> f'mal grading plan which shall specifically address measures to prevent soil, <br /> dirt, and debris from entering the storm drain system. Such measures may <br /> include, but are not limited to, hydroseeding, hay bales, sandbags, and siltation <br /> fences and are subject to the review and approval of the City Engineer/Director <br /> of Building Inspection. If no grading plan is required, necessary erosion <br /> control/storm water quality measures shall be shown on the site plan submitted <br /> for an on-site permit, subject to the review and approval of the Director of <br /> Building Inspection. The applicant is responsible for ensuring that the <br /> contractor is aware of and implements such measures. <br /> <br />73. All cut and fill slopes shall be revegetated and stabilized after completion of <br /> grading, but in no case later than October 15. Hydroseeding shall be <br /> accomplished before September 15 and irrigated with a temporary irrigation <br /> system to ensure that the grasses are established before October 15. No <br /> grading shall occur between October 15 and April 15 unless approved erosion <br /> control/storm water quality measures are in place, subject to the approval of <br /> the City Engineer/Director of Building Inspection. Such measures shall be <br /> maintained until such time as permanent landscaping is place. <br /> <br />74. The applicant shall submit a construction Best Management Practices (BMP's) <br /> program for review and approval by the Planning Director prior to issuance of <br /> building and/or grading permits. These BMP's shall be implemented by the <br /> general contractor and all subcontractors and suppliers of materials and <br /> equipment. Construction site cleanup and control of construction debris shall <br /> also be addressed. Failure to comply with the approved construction BMP <br /> may result in the issuance of correction notices, citations, or a stop work order. <br /> <br />75. The applicant is responsible for implementing the following measures during <br /> all on all construction phases of the project: <br /> <br />a. Gather all construction debris on a regular basis and place it in a dumpster or <br /> other container which is emptied or removed on a weekly basis. When <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.