Laserfiche WebLink
62. Approval of the storm drainage system shall be subject to the review and <br /> approval of the City Engineer and Zone 7, as applicable, that the system is <br /> adequate, connects to an approved point of discharge, meets any and all <br /> applicable requirements of the Alameda County Flood Control District - Zone <br /> 7, meets any and all applicable requirements of the Federal Emergency <br /> Management Flood Hazard Program, the California Department offish and <br /> Game, and meets the immediate and long-range requirements of this <br /> development and all upstream areas intended to be drained through this <br /> development. <br /> <br />63. Electric power distribution, gas distribution, communication service, cable <br /> television, and any required alarm systems shall be installed underground in a <br /> joint utility trench unless otherwise specifically approved by the City Engineer <br /> or Director of Building Inspection. <br /> <br />64. Should street lighting be desired, the applicant shall be responsible for the <br /> installation of the street lighting system serving the development. The <br /> streetlights shall be generally consistent with the Greenbriar PUD development <br /> plan and shall be privately owned and maintained. Approval for the number, <br /> location, and type of electroliers shall be subject to the review and approval of <br /> the City Engineer. <br /> <br />65. Street lighting for the development shall be designed and located so as to <br /> minimize visibility offsite to the greatest extent possible, subject to the review <br /> and approval of the City Engineer and Planning Director. <br /> <br />66. Any damage to existing street improvements during construction on the subject <br /> property shall be repaired to the satisfaction of the City Engineer at full <br /> expense to the developer. This shall include slurry seal, overlay, or street <br /> reconstruction if deemed warranted by the City Engineer. <br /> <br />67. The applicant's contractor(s) shall obtain an encroachment permit fi.om the City <br /> Engineer prior to moving any construction equipment onto the site. <br /> <br />68. The applicant shall comply with the City's non-point storm drain run-off <br /> ordinance. <br /> <br />69. The storm drainage from each lot shall be directed to an approved storm drain <br /> system in accordance with Sections 2907(b)(5) and 7012(d) of the 1988 <br /> Uniform unless otherwise approved by the Building Official and City <br /> Engineer. <br /> <br /> <br />