Laserfiche WebLink
EAST BAY REGIONAL COMMUNICATIONS SYSTEM <br /> ENGINEERING DESIGN STUDY <br /> y" &n)r "5 <br /> Motorola will supply and install the following equipment at the Doolan Site: <br /> GCP8000 Central Controllers (2) <br /> ASTRO® P25 Comparators (8) <br /> Prime Site Network Router (2) <br /> Prime Site Network Switches (2) <br /> GPS Time Reference <br /> Channel Bank (TeNSr) <br /> Remote Site Network Router (1) <br /> Remote Site Network Switch (2) <br /> GTR 8000 Simulcast Trunking Base Station (8) <br /> Receiver Multicoupler <br /> Transmitter Combiner <br /> Duplexer <br /> Antenna (Antel BCR 80013 -25) <br /> TRAK GPS antennas (2) <br /> -48 VDC Rectifier <br /> 115 VAC Inverter <br /> Battery Disconnect Switch <br /> -48 VDC Battery Stack <br /> Use or disclosure of this proposal is subject to the restrictions on the title page. MOTOROLA <br /> Motorola Confidential Proprietaty <br /> August, 2006 <br /> 2 <br />