My WebLink
|
Help
|
About
|
Sign Out
NILES PLEASANTON TRACK CONSOLIDATION 1984
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
A
>
ALAMEDA COUNTY
>
NILES PLEASANTON TRACK CONSOLIDATION 1984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2010 5:13:36 PM
Creation date
8/24/2009 9:06:54 AM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
3/13/1984
LONG TERM AGREEMENTS - NAME
NILES PLEASANTON TRACK CONSOLIDATION
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
LONG TERM AGREEMENTS - NOTES
SOUTHERN PACIFIC
Link Groups
Link
2:
NILES PLEASANTON TRACK CONSOLIDATION 1984
Last modified:
9/14/2010 5:13:36 PM
Path:
\CITY CLERK\LONG TERM AGREEMENT\A\ALAMEDA COUNTY
Comments:
TRACK CONSOLIDATION 1984
Link
1:
NILES PLEASANTON TRACK CONSOLIDATION 1982
Last modified:
9/14/2010 5:13:23 PM
Path:
\CITY CLERK\LONG TERM AGREEMENT\A\ALAMEDA COUNTY
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NILES - PLEASANTON TRACK CONSOLIDATION PROJECT <br />SECTION IV - contd. <br />2. That financial obligations and contractual commitments on the part <br />of either CITY or COUNTY required in the execution of this agreement are based <br />upon the award of grade crossing separation funds from the State of California in <br />the allocated amount of $5,000,000. <br />3. That the cost of the project shall include, but not be limited to: <br />a . Preliminary engineering, utility relocations, construction <br />engineering, contract administration, appraisals, and related <br />costs. <br />b. Costs of rights -of way acquired by either CITY or COUNTY as <br />defined in paragraph 5, Part II, of the aforesaid four -party <br />agreement executed on March 23, 1982, in connection with the <br />project. <br />c. The actual final quantities used in construction of the <br />project, including the approaches to the three grade separation <br />structures, to which shall be applied the corresponding unit <br />prices contained in the construction contracts. <br />d. The actual cost of work by forces of the two railroad companies <br />involved in the project, subject to the limitations set <br />forth in subparagraph 8d, Part I, of the aforesaid four -party <br />agreement executed on March 23, 1982, in connection with the <br />project. <br />e. The total cost to remove the existing South Verona underpass <br />structure (CPUC Underpass No. 4- 37.2 -B), and restore the <br />related roadway. <br />f. The actual cost of supplemental items and engineering applicable <br />to the design and construction of the project. <br />4. That the preliminary sharing of the grade separation funds to be <br />received from State of California in the allocated amount of $5,000,000 will <br />be on the basis of 75% to CITY and 25% to COUNTY. <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.